Skip to content
PlanIndex Get alerts
Menu

Planning application

Ashton Cottage Angle Road Kirriemuir DD8 4PL

Granted Angus 25/00461/FULL Full Local Application

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Formation of dormer window to rear elevation of house

As published by the council, reference 25/00461/FULL

Application record

Reference
25/00461/FULL
Type
Full Local Application
Status
Approved Subject to Conditions
Decision
approved subject to conditions
Received
20 Aug 2025
Validated
5 Sep 2025
Decided
16 Oct 2025
Ward
Kirriemuir & Dean
Parish
Kirriemuir
Decision by
Delegated
Postcode
DD8 4PL

Timeline

Dates from the published record

  1. 20 Aug 2025

    Received by Angus

  2. 5 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 16 Oct 2025

    Decision issued: approved subject to conditions

  4. 28 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 25/00165/FULL (Approved Subject to Conditions)
  • Scottishbuildingwarrant: 25/01011/DOM (Building Work Started)

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

  • APPROVED Decision Notice · 16 Oct 2025
  • REPORT OF HANDLING Report · 15 Oct 2025
  • PROPOSED NORTH WEST ELEVATION Drawing · 02 Oct 2025
  • PROPOSED NORTH EAST ELEVATION Drawing · 05 Sep 2025
  • PROPOSED SECTION B-B Drawing · 05 Sep 2025
  • PROPOSED SITE PLAN Drawing · 05 Sep 2025
  • PROPOSED SOUTH EAST ELEVATION Drawing · 05 Sep 2025
  • PROPOSED SOUTH WEST ELEVATION Drawing · 05 Sep 2025
  • APPLICATION PDF Application Form · 20 Aug 2025
  • A LOCATION PLAN Drawing · 20 Aug 2025
  • EXISTING FIRST FLOOR PLAN Drawing · 20 Aug 2025
  • EXISTING NORTH EAST ELEVATION Drawing · 20 Aug 2025
  • EXISTING NORTH WEST ELEVATION Drawing · 20 Aug 2025
  • EXISTING SOUTH EAST ELEVATION Drawing · 20 Aug 2025
  • EXISTING SOUTH WEST ELEVATION Drawing · 20 Aug 2025
  • GROUND FLOOR LAYOUT Drawing · 20 Aug 2025
  • PROPOSED FIRST FLOOR PLAN Drawing · 20 Aug 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Angus granted permission on 16 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Angus

  • 26/00424/FULL Granted

    20 Dorward Road Montrose DD10 8RT

    Alterations and replacement rear extension to house

    20 Jul 2026 Full applications
  • 26/00328/FULL Granted

    1 Mount Pleasant Letham Mill St Vigeans Arbroath DD11 4RG

    Proposed extension to rear elevation of house and garage replacement

    2 Jun 2026 Full applications
  • 26/00414/FULL Granted

    18 Berryhill Invergowrie Dundee DD2 5JH

    Proposed extension to rear of house

    9 Jul 2026 Full applications
  • 26/00533/FULL Awaiting decision

    Mavisbank Suttieside Road Forfar DD8 3NG

    Replacement extension to dwellinghouse and formation of patio and pergola

    14 Sep 2026 Full applications
  • 26/00011/FULL Refused

    Greenacres The Drive Edzell Brechin DD9 7XX

    Demolition of existing dwellinghouse and erection of new dwellinghouse and associated works

    13 Jan 2026 Full applications