Planning application
Balnuith BESS Land Adjacent To Tealing Substation Tealing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consultation for the installation of battery energy storage system submitted to the Scottish Ministers
As published by the council, reference 23/00831/S36
Application record
- Reference
- 23/00831/S36
- Type
- Energy Consent Consultation
- Status
- No Objection
- Decision
- Granted As published: No Objection
- Received
- 21 Nov 2023
- Validated
- 23 Nov 2023
- Decided
- 21 Mar 2024
- Ward
- Monifieth & Sidlaw
- Parish
- Tealing
- Decision by
- Delegated
Timeline
Dates from the published record
-
21 Nov 2023
Received by Angus
-
23 Nov 2023
Validated
Checked as complete and ready for consideration.
-
21 Mar 2024
Decision issued: No Objection
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
AAH Planning Consultants Agent and applicant, a planning consultancy
51 applications on PlanIndex · across 25 councils · 74% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
- ISSUED BY ENERGY CONSENTS UNIT
- PRELIMINARY ECOLOGICAL APPRAISAL
- SITE LAYOUT
- FLOOD RISK ASSESSMENT
- BATTERY DETAIL
- LANDSCAPE PLAN
- CLIENT AND CONTROL ROOM
- BATTERY UNIT
- ARCHAEOLOGICAL WALKOVER SURVEY
- TREE REPORT
- ACOUSTIC FENCING DETAIL
- ACCESS GATE DETAIL
- LVIA APPENDICES
- LVIA FIGURES
- LANDSCAPE AND VISUAL IMPACT REPORT
- NOISE ASSESSMENT
- PAC REPORT
- PLANNING DESIGN AND ACCESS STATEMENT
- CCTV AND SECURITY LIGHTING DETAIL
- TRANSFORMER UNIT DETAIL
- TRANSFORMER DETAIL
- TRANSPORTATION STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Angus granted permission on 21 March 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Angus
-
26/00388/PPPL Granted
2 Woodside Road Letham Forfar DD8 2QD
Residential development and associated works including access, landscaping and open space
-
26/00037/PPPL Granted
Farm Building 30M North Of Westfield House Duntrune
Planning Permission in Principle for the Demolition of a Redundant Farm Building and Erection of a Dwellinghouse
-
26/00460/EIASCR Awaiting decision
Cable Route From Lunanhead To Montreathmont Montreathmont Forfar
Underground cable route to connect the consented solar farm and BESS development at Montreathmont (Angus Council ref: 22/00460/FULM) to the point of connection (PoC) at Lunanhead substation. The length of the cable will be approximately 12.8 kilometres.
-
26/00442/PPPM Awaiting decision
Westfield Development Westfield Loan Forfar
Planning Permission in Principle for residential development, associated infrastructure, open space and landscaping, including the associated access arrangements
-
26/00223/PPPL Granted
Land 35M South West Of Mains Of Craichie Craichie Forfar
Planning permission in principle for the erection of a single dwellinghouse, including the formation of vehicular access and associated infrastructure