Planning application
22 Tayside Street Carnoustie DD7 6AX
Works: Loft or dormer Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Remove existing dormer and formation of replacement dormer with French doors and barrier on south/front elevation of upper floor flat
As published by the council, reference 22/00757/FULL
Application record
- Reference
- 22/00757/FULL
- Type
- Full Local Application
- Status
- Approved Subject to Conditions
- Decision
- approved subject to conditions
- Received
- 9 Nov 2022
- Validated
- 2 Feb 2023
- Decided
- 7 Mar 2023
- Ward
- Carnoustie And District
- Parish
- Carnoustie
- Decision by
- Delegated
- Postcode
- DD7 6AX
Timeline
Dates from the published record
-
9 Nov 2022
Received by Angus
-
2 Feb 2023
Validated
Checked as complete and ready for consideration.
-
7 Mar 2023
Decision issued: approved subject to conditions
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21 Tayside Street Carnoustie DD7 6AX
Extension to replace conservatory
Granted Full applications Extension 7 docs -
45 Ireland Street Carnoustie DD7 6AU
Change of use of garden ground to allow for the siting of a caravan for use as a short-term let accommodation
Refused Full applications 10 docs -
Land At Ireland Street Carnoustie
Approval of Matters Specified in Condition 3(a) - (g) and 4 of application 25/00092/PPPL including siting of the building, design, layout, car parking, access, boundary enclosures, landscaping, drainage, ground levels, floor level and noise mitigation
Granted Conditions 11 docs -
Aboukir Hotel 38 Ireland Street Carnoustie DD7 6AT
Conversion of Beer Garden of Aboukir Hotel to Dwellinghouse plot
Granted Outline 5 docsDomestic -
Aboukir Hotel 38 Ireland Street Carnoustie DD7 6AT
Proposed change of use of existing hotel and restaurant to form health centre and associated shelter accommodation
Withdrawn Full applications 8 docs -
2 Long Row Carnoustie DD7 6BE
Alterations to outbuilding to form 2 storey ancillary accommodation
Granted Full applications 12 docs
Other full applications applications
In Angus
-
26/00512/FULL Awaiting decision
Invergrange Grange Road Monifieth Dundee DD5 4PT
Proposed extension and alterations to existing dwellinghouse
-
26/00501/FULL Awaiting decision
West Newton House West Newton Arbroath DD11 5RQ
Erection of Essential Workers House and Associated Works
-
26/00135/FULL Granted
Home Farmhouse Dunnichen Forfar DD8 2NX
Formation of play area, erection of 6m fence, and associated works
-
26/00499/FULL Awaiting decision
1 West High Street Forfar DD8 1BD
External alterations to south elevation consisting of the provision of buttress supports
-
26/00495/FULL Awaiting decision
1 Kellas Road Wellbank Dundee DD5 3PE
Erection of no.5 houses and associated works