Planning application
Land South West Of Auchavan Estate Folda Glen Isla
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formation of an access track (part-retrospective)
As published by the council, reference 21/00943/FULL
Application record
- Reference
- 21/00943/FULL
- Type
- Full Local Application
- Status
- Approved Subject to Conditions
- Decision
- Granted As published: approved subject to conditions
- Received
- 1 Dec 2021
- Validated
- 22 Feb 2022
- Decided
- 21 Mar 2023
- Ward
- Kirriemuir & Dean
- Parish
- Kirriemuir Landward West
- Decision by
- Delegated
Timeline
Dates from the published record
-
1 Dec 2021
Received by Angus
-
22 Feb 2022
Validated
Checked as complete and ready for consideration.
-
21 Mar 2023
Decision issued: approved subject to conditions
-
6 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Enforcement: 20/00056/UNDV (Case Closed)
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
- APPROVED
- REPORT OF HANDLING
- APPRAISAL OF CULVERT CAPACITY
- APPRAISAL OF THE IMPACT OF EXCAVATION AND INSTALLATION OF DRAINAGE INFRASTRUCTUR
- SUPPLEMENTARY INFORMATION - COVER LETTER
- HYDRAULLIC MODELLING OF PROPOSED BRIDGE USING SEPA'S 2022 CLIMATE CHANGE UPLIFT
- WATER MANAGEMENT PLAN - UPDATED
- PEAT IMPACT ASSESSMENT
- TRACK SECTION AND CONSTRUCTION SPECIFICATION
- LOCATION PLAN WITH CULVERT LOCATIONS
- TYPICAL CULVERT CONSTRUCTION DETAIL
- LOCATION PLAN
- LOCATION PLAN (1:12500)
- LAND OWNERSHIP PLAN (1:12500)
- BLOCK PLAN WITH LOCATION OF WATER CROSSING
- COVER LETTER
- DRAINAGE IMPACT ASSESSMENT
- LOCATION PLAN (1:2500)
- TRACK SURVEY SECTION SHEET 1 OF 3
- TRACK SURVEY SECTION SHEET 2 OF 3
- TRACK SURVEY SECTION SHEET 3 OF 3
- TRACK LOCATON PLAN (1:5000)
- TRACK SURVEY TOPOGRAPHICAL PLAN WITH SECTIONS KEY
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Angus granted permission on 21 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Angus
-
26/00396/FULL Granted
Balgray Cottage Tealing Dundee DD4 0QZ
Erection of a cabin annexe
-
26/00456/FULL Granted
9 Railway Place Montrose DD10 8HN
Proposed change of use from domestic residence to short term let
-
26/00427/FULL Granted
Ladlewell Kingston Road Kingsmuir Forfar DD8 2RS
Proposed demolition of existing house and erection of replacement house and garage with associated works
-
26/00475/FULL Granted
2 Kirkton Bank Kirkton Of Auchterhouse Dundee DD3 0QS
Formation of dormer on dwellinghouse
-
26/00311/FULL Withdrawn
Stotfaulds Farmhouse Monikie Dundee DD5 3QH
Erection of two storey extension to dwellinghouse and associated works