Planning application
Ark Hill Wind Farm Glen Ogilvie Glamis
Works: Extension
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Extension to the existing Ark Hill Wind Farm
As published by the council, reference 21/00580/EIASCO
Application record
- Reference
- 21/00580/EIASCO
- Type
- EIA Scoping
- Status
- Awaiting decision
- Decision
- Dormant Application
- Received
- 23 Jul 2021
- Validated
- 23 Jul 2021
- Decided
- 11 Oct 2021
- Ward
- Kirriemuir & Dean
- Parish
- Glamis
- Decision by
- Delegated
Site history
Applications at this address on the Angus register
This site has had 2 applications since 2021: 1 approved, 0 refused.
-
21/00765/EIAL Granted
Ark Hill Wind Farm Glen Ogilvie Glamis
Extension of Ark Hill Wind Farm consisting of the erection of 4 wind turbines measuring a maximum height of 89.5 metres (to blade tip) with a rotor diameter of 71 metres, the formation of access tracks and associated hardstanding areas, set down areas, construction compound, electrical sub station and borrow pit
Timeline
Dates from the published record
-
23 Jul 2021
Received by Angus
-
11 Oct 2021
Decision issued: Dormant Application
-
11 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Angus has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ark Hill Wind Farm Glen Ogilvie Glamis
Extension of Ark Hill Wind Farm consisting of the erection of 4 wind turbines measuring a maximum height of 89.5 metres (to blade tip) with a rotor diameter of 71 metres, the formation of access tracks and associated hardstanding areas, set down areas, construction compound, electrical sub station and borrow pit
Granted Outline Extension 71 docs
Other outline applications
In Angus
-
26/00388/PPPL Granted
2 Woodside Road Letham Forfar DD8 2QD
Residential development and associated works including access, landscaping and open space
-
26/00037/PPPL Granted
Farm Building 30M North Of Westfield House Duntrune
Planning Permission in Principle for the Demolition of a Redundant Farm Building and Erection of a Dwellinghouse
-
26/00460/EIASCR Awaiting decision
Cable Route From Lunanhead To Montreathmont Montreathmont Forfar
Underground cable route to connect the consented solar farm and BESS development at Montreathmont (Angus Council ref: 22/00460/FULM) to the point of connection (PoC) at Lunanhead substation. The length of the cable will be approximately 12.8 kilometres.
-
26/00442/PPPM Awaiting decision
Westfield Development Westfield Loan Forfar
Planning Permission in Principle for residential development, associated infrastructure, open space and landscaping, including the associated access arrangements
-
26/00223/PPPL Granted
Land 35M South West Of Mains Of Craichie Craichie Forfar
Planning permission in principle for the erection of a single dwellinghouse, including the formation of vehicular access and associated infrastructure