Planning application
A6 Derby Road Bus Stop Derby Road Milford Belper Derbyshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed interpretation panel (may affect the setting of a listed building and conservation area)
As published by the council, reference AVA/2022/0997
Application record
- Reference
- AVA/2022/0997
- Status
- Application Approval
- Decision
- Granted As published: PER
- Received
- 10 Nov 2022
- Validated
- 22 Nov 2022
- Decided
- 21 Feb 2023
- Ward
- Belper South
- Decision by
- Delegated
Timeline
Dates from the published record
-
10 Nov 2022
Received by Amber Valley
-
22 Nov 2022
Validated
Checked as complete and ready for consideration.
-
21 Feb 2023
Decision issued: PER
-
9 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Amber Valley granted permission on 21 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Amber Valley's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
1 The Bridge Milford Belper Derbyshire DE56 0RR
T1 - sycamore reduce branch going towards road by 1.5/2 metres ,crown lift and crown thin by 25% T2 -Alder crown clean and crown lift T3-sycamore crown lift and thin by 25% T4-alder to fell T5-sycamore to thin by 25% crown reduce top and mainly side overhanging river to reduce lean and crown lift T6-alder to reduce the longer branches overhanging garden side ,crown raise and thin by 25% T7-to reduce back from building by 1.5/2 metres
Granted Trees -
The Old Post Office Quarry Cottages 2 The Bridge Milford Belper Derbyshire DE56 0RR
Various tree works
Granted Trees -
Milford Mills Development Derby Road Milford Belper Derbyshire
Application Reference Number: AVA/2021/0046 Date of Decision: 30/04/2021 Condition Number(s): Re-wording of condition 2 (approved plans) and subsusquent re-wording/removing of following conditions: 3, 5, 7, 8, 13, 23, 28, 45, 46, 62, 63, 64 (in line with individual justification on commentary document). Conditions(s) Removal: Condition 2 - Change condition. Varied plans to suit revised building design strategy due to clashes with the existing site features (lade) and updated building elevations to suit feedback recieved from DCC Heritage. Condition 3 - Remove condition. Proposed levels plans submitted in this applciation and to be included as part of approved plans in condition 2. Condition 5 - Remove condition. No brickwork is proposed on the newly submitted building elevations. Condition 7 - Remove condition. CFSH was abandoned by the Government in 2016. Condition 8 - Change condition. Proposed landscaping plans submitted in this application and to be included as part of approved plans in condition 2. Remove requirement to submit further information for approval. Condition 13 - Remove condition. No seperate pedestrian entrance is proposed as entire development is designed as a ???shared surface??? due to minimal traffic movements. Condition 23 - Remove condition. Proposed boundary treatments submitted in this application and to be included as part of approved plans in condition 2. Condition 28 - Remove condition. Proposed boundary treatments submitted in this application and to be included as part of approved plans in condition 2. Condition 45 - Change condition. Proposed refuse/service vehicle tracking diagrams submitted in this application and to be included as part of approved plans in condition 2. Remove requirement to submit further information for approval. Condition 46 - Change condition. Proposed cycle storage layout submitted in this application and to be included as part of approved plans in condition 2. Remove requir...
Decided 33 docs -
Milford Mills Development Derby Road Milford Belper Derbyshire
98% historically approved · decision due ~30 Nov
Non material amendment to AVA/2023/0265 to alter the approved drainage layouts consented
Awaiting decision 10 docs -
The Dye House Milford Mill Derby Road Milford Belper Derbyshire DE56 0RR
98% historically approved · decision due ~18 Jun
Listed building consent for the installation of internal stud wall, boiler and externally mounted flue, and other works to facilitate use as a cafe
Awaiting decision 38 docs -
Ebenezer Chapel Makeney Road Makeney Milford Belper Derbyshire DE56 0RR
T1 - Large multi stemmed Sycamore located to the top of the cliff face to the rear of the chapel and has a branch growing out that is causing concern about its proximity to the building. Remove this stem.
Granted Trees 1 doc