EIA Screening Opinion for reconfiguration of buildings and facilities including the provision of additional pitches; extension of the existing Elite Football Performance Centre; erection of a Women's and Girls' Elite Football Performance Centre; relocation of the indoor pitch and spectator stand and provision of additional parking spaces.
As published by the council, reference EIAOPINION/0003/18
Timeline
Dates from the published record
-
4 Dec 2018
Received by Adur
-
18 Dec 2018
Decision issued: Delegated
-
22 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Adur is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
AWDM/0555/21 Granted
Brighton And Hove Albion Training Ground 60 Mash Barn Lane Lancing West Sussex BN15 9FP
Application for Approval of Details Reserved by Condition 26 (Updated Community Use Agreement) of approved AWDM/0236/19
-
AWDM/1021/21 Granted
Brighton And Hove Albion Training Ground 60 Mash Barn Lane Lancing West Sussex BN15 9FP
Application for Minor Material Amendments to approved application reference AWDM/0236/19 namely: Provision of a covered standing area for parents adjacent to parents lounge, Provision of a covered walkway between the Club Hub and Training Centre, Provision of refuse enclosure adjacent to bin store, Extended goal storage alcove, Relocation of internal stair well to exterior of building and reuse of internal floorspace, Installation of new vehicular and pedestrian security gates (retrospective)
-
AWDM/1461/19 Granted
Brighton And Hove Albion Training Ground 60 Mash Barn Lane Lancing West Sussex BN15 9FP
Approval of Details Reserved by Conditions : Cond 3 (Materials); Cond 4 (Drainage Details); Cond 8 (Parking Details); and Cond 25 (Biodiversity Details) of Application no. AWDM/0236/19
-
AWDM/0032/20 Granted
Brighton And Hove Albion Training Ground 60 Mash Barn Lane Lancing West Sussex BN15 9FP
Application for Variation of Condition 1 (approved plans) to AWDM/0236/19 for amendments to fenestration of the Training Centre, reduced plant louvre screen on the roof of the Training Centre, addition of a stair enclosure to the roof of the Training Centre; reduced height of link between Training Centre and indoor pitch, various minor amendments to fenestration of the Club Hub, and increased height of the plant louvres to roof of Club Hub. Amendment to approved fencing details on eastern boundary and provision of additional landscaping.
-
AWDM/0929/19 Granted
Brighton And Hove Albion Training Ground 60 Mash Barn Lane Lancing West Sussex BN15 9FP
Approval of Details Reserved by Conditions 5 (SUDS maintenance) and 11 (construction method statement) of Application No. AWDM/0236/19.
-
AWDM/0236/19 Granted
Brighton And Hove Albion Training Ground 60 Mash Barn Lane Lancing West Sussex BN15 9FP
Reconfiguration and extension of Training Ground including extension to existing Training Centre building, erection of a new single storey 'Club Hub' building to include women's and girls' changing rooms, community changing rooms and pitchside seating for parents/coaches, formation of an additional three pitches and training grid, reconfiguration of existing pitches including relocation of indoor pitch, showpitch, spectator stand, floodlighting and camera tower, provision of additional 51 parking spaces, provision of a temporary construction haul road from the A27, plus hard and soft landscaping.