Skip to content
PlanIndex Get alerts
Menu

Planning application

21 The Twitten Southwick Brighton West Sussex BN42 4DB

Granted Adur AWDM/1912/18

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Front porch (existing porch removed)

As published by the council, reference AWDM/1912/18

Application record

Reference
AWDM/1912/18
Decision
Granted As published: Approve
Received
2 Jan 2019
Decided
29 Jan 2019
Postcode
BN42 4DB

Site history

Applications at this address on the Adur register

This site has had 4 applications since 2017: 3 approved, 0 refused.

  • AWDM/0401/19 Granted

    21 The Twitten Southwick Brighton West Sussex BN42 4DB

    Non-Material Amendment to previously approved AWDM/1912/18 to construct a pitched roof rather than flat roof on the front porch.

    Decided 18 Apr 2019
  • AWDM/0219/18 Granted

    21 The Twitten Southwick Brighton West Sussex BN42 4DB

    First floor extension over existing ground floor extension to north elevation and front access ramp and platform.

    Decided 4 Apr 2018
  • AWDM/1593/17 Withdrawn

    21 The Twitten Southwick Brighton West Sussex BN42 4DB

    First floor extension over existing ground floor extension to north elevation

    Decided 27 Nov 2017

Timeline

Dates from the published record

  1. 2 Jan 2019

    Received by Adur

  2. 29 Jan 2019

    Decision issued: Approve

  3. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • AWDM/0401/19 Granted

    21 The Twitten Southwick Brighton West Sussex BN42 4DB

    Non-Material Amendment to previously approved AWDM/1912/18 to construct a pitched roof rather than flat roof on the front porch.

    Decided 18 Apr 2019

What this grant of permission means

Adur granted permission on 29 January 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Adur's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles