Planning application
Pump House C E G B Basin Road South Southwick West Sussex
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of two 100kw wind turbines, 35.4m from base to blade tip on the southern spur of land forming the eastern arm and breakwater of Shoreham Harbour. Application accompanied by an Environmental Impact Assessment.
As published by the council, reference AWDM/1702/14
Application record
- Reference
- AWDM/1702/14
- Decision
- Approve
- Received
- 19 Dec 2014
- Decided
- 29 Apr 2015
Site history
Applications at this address on the Adur register
This site has had 3 applications since 2014: 2 approved, 1 refused.
-
AWDM/1188/23 Granted
Pump House C E G B Basin Road South Southwick West Sussex
Construction of two 100kw wind turbines, 35.4m from base to blade tip on the southern spur of land forming the eastern arm and breakwater of Shoreham Harbour. Application accompanied by an Environmental Impact Assessment. Application to Vary Condition 8 of AWDM/1702/14 to allow painted black line pattern to the tips of the blades.
-
EIAOPINION/0001/14 Refused
Pump House C E G B Basin Road South Southwick West Sussex
2 no. wind turbines with a hub height of 24.5m and maximum height of 35.4m on land south-west of Pump House (Shoreham Port).
Timeline
Dates from the published record
-
19 Dec 2014
Received by Adur
-
29 Apr 2015
Decision issued: Approve
-
22 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
AWDM/1188/23 Granted
Pump House C E G B Basin Road South Southwick West Sussex
Construction of two 100kw wind turbines, 35.4m from base to blade tip on the southern spur of land forming the eastern arm and breakwater of Shoreham Harbour. Application accompanied by an Environmental Impact Assessment. Application to Vary Condition 8 of AWDM/1702/14 to allow painted black line pattern to the tips of the blades.
What this grant of permission means
Adur granted permission on 29 April 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Adur's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Pump House C E G B Basin Road South Southwick West Sussex
Construction of two 100kw wind turbines, 35.4m from base to blade tip on the southern spur of land forming the eastern arm and breakwater of Shoreham Harbour. Application accompanied by an Environmental Impact Assessment. Application to Vary Condition 8 of AWDM/1702/14 to allow painted black line pattern to the tips of the blades.
Granted -
Pump House C E G B Basin Road South Southwick West Sussex
2 no. wind turbines with a hub height of 24.5m and maximum height of 35.4m on land south-west of Pump House (Shoreham Port).
Refused -
Land East Of Pilots Watch House Basin Road South Southwick West Sussex
Provision of 8 new beach huts
Granted -
Land East Of Pilots Watch House Basin Road South Southwick West Sussex
Approval of Details Reserved by Condition 3 (floor and ground levels) of Application AWDM/0792/22.
Granted -
Land South West Of Basin Road South Southwick West Sussex
Construction of 5no. private beach huts.
Withdrawn -
Land And Workshop Building North Of Dry Dock Locks Approach Albion Street Southwick West Sussex
Removal of the existing workshop structure associated with the Dry Dock and replacement with a new building to accommodate a reconfigured workshop on ground floor; a new cafe use on ground and first floors and a new office unit at first floor an outdoor seating area, landscaping and car parking provision at the Dry Dock, Albion Street, Southwick.
Granted