Planning application
Fairfield Inverurie Aberdeenshire AB51 5BL
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Installation of 49.9MW Battery Energy Storage Scheme (BESS) and Associated Infrastructure
As published by the council, reference ENQ/2024/1599
Application record
- Reference
- ENQ/2024/1599
- Type
- Proposal of Application Notice
- Status
- Decided
- Decision
- PAC Additional Nots/Cons Required
- Received
- 29 Oct 2024
- Validated
- 1 Nov 2024
- Decided
- 7 Nov 2024
- Ward
- West Garioch
- Parish
- Bennachie
- Decision by
- Delegated
- Postcode
- AB51 5BL
Site history
Applications at this address on the Aberdeenshire register
This site has had 2 applications since 2024.
-
ENQ/2024/0934 Decided
Fairfield Inverurie Aberdeenshire AB51 5BL
EIA Screening Opinion for Erection of Battery Energy Storage System (BESS)
Timeline
Dates from the published record
-
29 Oct 2024
Received by Aberdeenshire
-
1 Nov 2024
Validated
Checked as complete and ready for consideration.
-
7 Nov 2024
Decision issued: PAC Additional Nots/Cons Required
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Aberdeenshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Aberdeenshire's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Fairfield Inverurie Aberdeenshire AB51 5BL
EIA Screening Opinion for Erection of Battery Energy Storage System (BESS)
Decided Outline 2 docs -
Land At Fairfield Inverurie AB51 5BL
Installation of Battery Energy Storage System (BESS) with an Installed Capacity of 49.9MW and Associated Infrastructure
Refused Full applications 131 docs