Planning application
Dey Hill Macduff AB44 1RU
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Installation of Battery Energy Storage System (BESS) with Installed Capacity of 49.9MW with Associated Infrastructure
As published by the council, reference ENQ/2024/0845
Application record
- Reference
- ENQ/2024/0845
- Type
- EIA Screening Request
- Status
- Decided
- Decision
- EIA Opinion Adopted
- Received
- 10 Jun 2024
- Validated
- 11 Jun 2024
- Decided
- 26 Jun 2024
- Ward
- Troup
- Parish
- Banff & Macduff
- Postcode
- AB44 1RU
Timeline
Dates from the published record
-
10 Jun 2024
Received by Aberdeenshire
-
11 Jun 2024
Validated
Checked as complete and ready for consideration.
-
26 Jun 2024
Decision issued: EIA Opinion Adopted
-
22 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
Dey Hill Macduff AB44 1RU
Installation of Battery Energy Storage System (BESS) with installed Capacity of 49.9MW with Associated Infrastructure
Decided 4 docs -
Tarlair Business Park Old Gamrie Road Macduff Aberdeenshire
Erection of Council Depot Facility Providing Covered and External Storage; Waste Transfer Station; Office Space; Welfare Facilities; Vehicle Washing and Fuelling with Associated Car ParkingErection of Council Depot Facility Providing Covered and External Storage; Waste Transfer Station; Office Space; Welfare Facilities; Vehicle Washing and Fuelling with Associated Car Parking
Granted Full applications 63 docs -
Ground At Macduff Industrial Estate Tarlair Way Macduff AB44 1RU
Change of Use of Land to Car Sales (Sui Generis) and Erection of Office Building
Granted Full applications 10 docs -
20 Hall Crescent Macduff Aberdeenshire AB44 1QB
Alterations and Extension to Dwellinghouse and Erection of Garage
Granted Full applications Extension 9 docsDomestic -
Site 17 Macduff Industrial Estate Old Gamrie Road Macduff Aberdeenshire AB44 1GD
Erection of Building (Use Class 5) and Boundary Fence
Withdrawn Full applications 13 docsSmall domestic -
Site 17A Macduff Industrial Estate Old Gamrie Road Macduff Aberdeenshire
Erection of 2 Industrial Units (Class 5)
Granted Full applications 12 docs
Other outline applications
In Aberdeenshire
-
APP/2026/0778 Granted
Land At The Rear Of Strathlyn Main Street Garmond Cuminestown AB53 5TQ
Erection of Dwellinghouse
-
ENQ/2026/0238 Decided
Field Below Steading St Johns Wells Farm Fyvie AB51 8PX
Erection of Free Range Poultry Building, 2 Feed Silos and Associated Infrastructure
-
ENQ/2026/0208 Decided
Cromlet Farm St Katherines Aberdeenshire AB51 8SP
Erection of Free Range Poultry Building, 4 Silos and Associated Infrastructure
-
APP/2025/0877 Refused
Site Adjacent To Safelift Offshore Ltd Aquithie Road Kemnay AB51 5PD
Change Of Use To Form Football Pitch And Associated Facilities
-
APP/2026/0768 Granted
Land At Upper Muirskie Netherley AB12 5GS
Erection of Dwellinghouse