Planning application
Cairnrobin Quarry Nigg Aberdeenshire AB12 4SB
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Storage and Processing of Incinerator Bottom Ash (IBA), Storage and Distribution of Incinerator Bottom Ash Aggregates (IBAA) and Associated Recyclates and Drainage and Access Infrastructure
As published by the council, reference ENQ/2020/1900
Application record
- Reference
- ENQ/2020/1900
- Type
- Proposal of Application Notice
- Status
- Decided
- Decision
- PAC Agreed as Specified in Notice
- Received
- 24 Dec 2020
- Validated
- 24 Dec 2020
- Decided
- 20 Jan 2021
- Ward
- North Kincardine
- Parish
- Portlethen & District
- Decision by
- Delegated
- Postcode
- AB12 4SB
Timeline
Dates from the published record
-
24 Dec 2020
Received by Aberdeenshire
-
20 Jan 2021
Decision issued: PAC Agreed as Specified in Notice
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Aberdeenshire is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Unit 5 Cairnrobin Way Portlethen AB12 4NJ
Site Alterations to the Operational Areas Surrounding the Warehouse and Development of the Eastern Part of the Site for the Storage of Operational Vehicles, Including Resurfacing, Amendments to Access and Ancillary Infrastructure
Granted Full applications 104 docs -
Cairnrobin Industrial Park Marywell Aberdeen AB12 4NJ
95% historically approved · decision due ~19 Jul
Site Alterations to the Operational Areas Surrounding the Warehouse and Development of the Eastern Past of the Site for the Storage of Operational Vehicles, Including Resurfacing, Amendments to Access and Ancillary Infrastructure
Awaiting decision 3 docs -
Marywell Pipeyard Nigg Aberdeenshire AB12 4SB
Change of Use from Class 6 (Storage and Distribution) to Class 5 (General Industrial) and Erection of Temporary Modular Rig (Retrospective)
Granted Full applications 6 docs -
OP1 Land East Of Old Stonehaven Road Marywell Aberdeenshire AB12 4LP
95% historically approved · decision due ~17 Jul
Development of 49 Dwellinghouses, Amenity Space and Associated Facilities
Awaiting decisionMajor scheme -
Xeretec Scotland Ltd Marywell Nigg Aberdeenshire AB12 4LP
Installation of 6 Fascia Signs and 1 Illuminated Totem Sign
Granted Advertising 10 docs -
Site At Oilfield Hire And Services Ltd Cairnrobin Pipeyard Portlethen Aberdeenshire AB12 4SB
95% historically approved · decision due ~29 Sep
Part Change of Use of Building (First Floor) from Business (Class 4) to Taxi Business (Sui Generis) (Retrospective)
Awaiting decision