Site To Rear Of 77-83 High Street New Aberdour Aberdeenshire

Granted Aberdeenshire APP/2024/1432 Approval of Matters Specified in Conds

Relates to APP/2022/2474

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Condition 1 ((a) Siting, Design, Layout, External Appearance, Finishing Materials, Driveway, Bin Uplift, Vehicle Parking and Turning; (b) Means of Access including Visibility Splays and vehicle lay by; (c) Landscaping Scheme; (d) Levels Survey and Site Sections; (e) Foul and Surface Water Disposal; (f) Water Supply Details) of Planning Permission in Principle Reference APP/2022/2474 Erection of Dwellinghouse

As published by the council, reference APP/2024/1432

Application record

Reference
APP/2024/1432
Type
Approval of Matters Specified in Conds
Status
Decided
Decision
Approved
Received
27 Aug 2024
Validated
6 Sep 2024
Decided
4 Nov 2024
Ward
Troup
Parish
New Aberdour, Tyrie & Pennan
Decision by
Delegated

Site history

Applications at this address on the Aberdeenshire register

This site has had 2 applications since 2022: 1 approved, 1 refused.

  • APP/2022/2474 Refused

    Site To Rear Of 77-83 High Street New Aberdour Aberdeenshire

    Erection of Dwellinghouse

    Decided 1 Feb 2023 Outline

Timeline

Dates from the published record

  1. 27 Aug 2024

    Received by Aberdeenshire

  2. 6 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 4 Nov 2024

    Decision issued: Approved

  4. 1 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • APP/2022/2474 Refused

    Site To Rear Of 77-83 High Street New Aberdour Aberdeenshire

    Erection of Dwellinghouse

    Decided 1 Feb 2023 Outline

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Aberdeenshire granted permission on 4 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Aberdeenshire

  • APP/2026/0311 Granted

    Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ

    Discharge of Conditions 7 (Habitat Management Plan), 21 (Site Investigation/Remediation Strategy) and 28 (Landscaping Scheme) of Planning Permission Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure

    16 Feb 2026 Conditions
  • APP/2026/0463 Granted

    Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ

    Discharge of Condition 23 (Private Water Supply) of Application Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure

    18 Mar 2026 Conditions
  • APP/2025/2024 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Discharge of Planning Conditions 3 (Demolition), 4 (Private Water), 7 (CTMP), 8 (CEMP) 12 (Schedule of Mitigation) and 13 (Socio-economic strategy) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    8 Dec 2025 Conditions
  • APP/2026/0071 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Discharge of Planning Conditions 5 (Offsite Landscaping), 6 (PMO), 9 (ECoW), 10 (BEMP) and 11 (Archaeology) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    16 Jan 2026 Conditions
  • APP/2025/1754 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Approval of Matters Specified in Conditions 2a)i, 2a)ii, 2a)iii, 2a)iv, 2a)v, 2a)vi, 2a)vii, 2a)viii, 2a)ix, 2a)x, 2a)xi, 2a)xii, 2a)xiii, 2a)xiv, 2a)xv and 2a)xvi (Lot 1 Civils) of Planning Permission ref: APP/2024/1714 for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    27 Oct 2025 Conditions