Planning application
Site To The North Of Four Winds Buckie Farm Boddam Aberdeenshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conditions 1(a) Layout Siting, External Appearance and Finishing Materials b) Landscaping c) Levels d) Disposal of Foul and Surface Water e) Access and Visibility f) Full Mitigation Statement g) Route Access Report h) Construction Environmental Management Plan i) External Lighting j) Construction Access) of Planning Permission Reference APP/2021/2681 for Erection of HVDC Electrical Converter Station and Associated Access Tracks, Drainage Works and Landscaping Including Enclosures
As published by the council, reference APP/2024/0507
Application record
- Reference
- APP/2024/0507
- Type
- Approval of Matters Specified in Conds
- Status
- Decided
- Decision
- Approved
- Received
- 1 Apr 2024
- Validated
- 18 Apr 2024
- Decided
- 26 Jul 2024
- Ward
- Peterhead South And Cruden
- Parish
- Boddam & District (Not Active)
- Decision by
- Delegated
Timeline
Dates from the published record
-
1 Apr 2024
Received by Aberdeenshire
-
18 Apr 2024
Validated
Checked as complete and ready for consideration.
-
26 Jul 2024
Decision issued: Approved
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
115 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Aberdeenshire granted permission on 26 July 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land At Upperton Industrial Estate Peterhead Aberdeenshire
Formation Of Temporary Haul Road
Granted Full applications 12 docs -
Land To The East Of Buckie Farm Boddam Aberdeenshire AB42 3AJ
Construction of Synchronous Condenser and Associated Infrastructure
Granted Full applications 50 docs -
Land To The East Of The A90 Invernettie Peterhead Aberdeenshire AB42 3AL
Widening of Access Road
Granted Full applications 22 docs -
Land To The East Of Buckie Farm Boddam Aberdeenshire AB42 3AJ
Construction of Synchronous Condenser and Associated Infrastructure
Decided Outline -
Land North West Of Four Winds Buckie Farm Boddam Aberdeenshire
Formation of a Cable Sealing End Tower Compound and Access
Granted Full applications 11 docs
Other condition discharge and variation applications
In Aberdeenshire
-
APP/2026/0311 Granted
Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ
Discharge of Conditions 7 (Habitat Management Plan), 21 (Site Investigation/Remediation Strategy) and 28 (Landscaping Scheme) of Planning Permission Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure
-
APP/2026/0463 Granted
Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ
Discharge of Condition 23 (Private Water Supply) of Application Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure
-
APP/2025/2024 Granted
Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead
Discharge of Planning Conditions 3 (Demolition), 4 (Private Water), 7 (CTMP), 8 (CEMP) 12 (Schedule of Mitigation) and 13 (Socio-economic strategy) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works
-
APP/2026/0071 Granted
Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead
Discharge of Planning Conditions 5 (Offsite Landscaping), 6 (PMO), 9 (ECoW), 10 (BEMP) and 11 (Archaeology) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works
-
APP/2025/1754 Granted
Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead
Approval of Matters Specified in Conditions 2a)i, 2a)ii, 2a)iii, 2a)iv, 2a)v, 2a)vi, 2a)vii, 2a)viii, 2a)ix, 2a)x, 2a)xi, 2a)xii, 2a)xiii, 2a)xiv, 2a)xv and 2a)xvi (Lot 1 Civils) of Planning Permission ref: APP/2024/1714 for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works