Planning application
The Old School House Chapel Brae Braemar Aberdeenshire AB35 5YT
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of Solar Panels
As published by the council, reference APP/2024/0049
Application record
- Reference
- APP/2024/0049
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 15 Jan 2024
- Validated
- 18 Jan 2024
- Decided
- 22 Apr 2024
- Ward
- Aboyne, Upper Deeside And Donside
- Parish
- Braemar
- Decision by
- Delegated
- Postcode
- AB35 5YT
Timeline
Dates from the published record
-
15 Jan 2024
Received by Aberdeenshire
-
18 Jan 2024
Validated
Checked as complete and ready for consideration.
-
22 Apr 2024
Decision issued: Approved
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Aberdeenshire granted permission on 22 April 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Chapelbrae Cottage 13 Chapel Brae Braemar AB35 5YT
Installation of Replacement Sliding Door and Window
Granted Full applications Windows or glazing 16 docs -
-
Flower Cottage Chapel Brae Braemar Aberdeenshire AB35 5YT
Replacement Roof, Alterations and Extension to Dwellinghouse
Granted Full applications Extension Roofing 30 docsDomestic -
Braemar Studio Chapel Brae Braemar Aberdeenshire AB35 5YT
Felling of 2 Bird Cherry Trees and 2 Noble Fir Trees, and Pruning of 1 Bird Cherry Tree
Granted Trees 6 docs -
Land Adjacent To Lily Bank Linn O'Dee Road Braemar AB35 5WT
Erection of Dwellinghouse Including Change of Use of Land to Garden Ground (Change of House Type to Planning Permission Reference APP/2014/0097)
Granted Full applications 34 docsDomestic -
Cnoc Na Mearlach Broombank Terrace Braemar Aberdeenshire AB35 5YX
Demolition of Dwellinghouse
Withdrawn Heritage and listed buildings Demolition 13 docsDomestic
Other full applications
In Aberdeenshire
-
APP/2026/1621 Awaiting decision
Base Station Tullich Invercauld Estate Pass Of Ballater Aberdeenshire
Installation Of Generator
-
APP/2026/1506 Awaiting decision
Surfside Caravan Park Harbour Road Fraserburgh AB43 9TB
Extension to Caravan Site Operating Times (March to January)
-
APP/2026/1489 Awaiting decision
3 Gean Court Balmedie AB23 8ST
Extension to Dwellinghouse and Installation of Flue
-
APP/2026/1494 Awaiting decision
18 David Mclean Drive Alford Aberdeenshire AB33 8PW
Erection of Garden Room (Retrospective)
-
APP/2026/1476 Awaiting decision
Huntly Hotel 18 The Square Huntly Aberdeenshire AB54 8BR
Alterations to Hotel Including Replacement Doors