Planning application

Plot 3 South Of New Aberdour Aberdeenshire

Granted Aberdeenshire APP/2023/0026 Approval of Matters Specified in Conds

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Condition 1 ((a) Siting, Design, Layout, External Appearance, Finishing Materials, Bin Uplift, Drop Kerb Footway Crossing, Vehicle Parking and Turning; (b) Means of Access including Visibility Splays; (c) Landscaping Scheme; (d) Levels Survey and Site Sections; (e) Foul and Surface Water Disposal of Planning Permission in Principle Reference APP/2019/0757 Erection of Dwellinghouse

As published by the council, reference APP/2023/0026

Application record

Reference
APP/2023/0026
Type
Approval of Matters Specified in Conds
Status
Decided
Decision
Approved
Received
12 Jan 2023
Validated
17 Jan 2023
Decided
23 Mar 2023
Ward
Troup
Parish
New Aberdour, Tyrie & Pennan
Decision by
Delegated

Timeline

Dates from the published record

  1. 12 Jan 2023

    Received by Aberdeenshire

  2. 17 Jan 2023

    Validated

    Checked as complete and ready for consideration.

  3. 23 Mar 2023

    Decision issued: Approved

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Aberdeenshire granted permission on 23 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Site To South Of New Aberdour New Aberdour Aberdeenshire

    APP/2023/0013 Submitted 9 Jan 2023 19m away

    Condition 1 (a) Siting and Layout, External Appearance and Finishing Materials of development including driveway, waste bin uplift area, vehicle parking and turning area; (b) Means of access; (c) Landscaping Scheme; (d) Levels Survey and Cross Sections; (e) Foul and Surface Water Disposal of Planning Permission in Principle Reference APP/2019/0068 Erection of Dwellinghouse

    Granted Conditions 12 docs
    Domestic
  • Site To The East Of Greenpark Cottage New Aberdour Aberdeenshire

    APP/2022/2163 Submitted 11 Oct 2022 46m away

    Condition 1 ((a) Siting, Design, Layout, External Appearance, Finishing Materials, including Driveway, Waste Bin Uplift Area, Vehicle Parking and Turning Area; (b) Means of Access including Visibility Splays, Vehicle Lay-by at junction; (c) Landscaping Scheme; (d) Levels Survey and Site Sections; (e) Foul and Surface Water Disposal) of Planning Permission in Principle Reference APP/2018/1849 for Erection of Dwellinghouse and Formation of Vehicular Access

    Granted Conditions 12 docs
    Domestic
  • Land Opposite Carlaw View New Aberdour Fraserburgh

    APP/2017/0843 Submitted 31 Mar 2017 234m away

    Erection of 3 Dwellinghouses

    Withdrawn Full applications 13 docs
    Several homes
  • Ground To North West Of Dugann Low Street New Aberdour Aberdeenshire

    APP/2017/0992 Submitted 17 Apr 2017 279m away

    Change of Use of Land and Erection of 2 Glamping Pods and Recreational/Shower Block Building

    Granted Full applications 12 docs
  • Land To South West Of Carlaw View New Aberdour Aberdeenshire

    APP/2020/2178 Submitted 3 Nov 2020 418m away

    Erection of Dwellinghouse

    Granted Full applications 19 docs
    Domestic

In Aberdeenshire

  • APP/2026/0311 Granted

    Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ

    Discharge of Conditions 7 (Habitat Management Plan), 21 (Site Investigation/Remediation Strategy) and 28 (Landscaping Scheme) of Planning Permission Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure

    16 Feb 2026 Conditions
  • APP/2026/0463 Granted

    Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ

    Discharge of Condition 23 (Private Water Supply) of Application Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure

    18 Mar 2026 Conditions
  • APP/2025/2024 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Discharge of Planning Conditions 3 (Demolition), 4 (Private Water), 7 (CTMP), 8 (CEMP) 12 (Schedule of Mitigation) and 13 (Socio-economic strategy) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    8 Dec 2025 Conditions
  • APP/2026/0071 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Discharge of Planning Conditions 5 (Offsite Landscaping), 6 (PMO), 9 (ECoW), 10 (BEMP) and 11 (Archaeology) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    16 Jan 2026 Conditions
  • APP/2025/1754 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Approval of Matters Specified in Conditions 2a)i, 2a)ii, 2a)iii, 2a)iv, 2a)v, 2a)vi, 2a)vii, 2a)viii, 2a)ix, 2a)x, 2a)xi, 2a)xii, 2a)xiii, 2a)xiv, 2a)xv and 2a)xvi (Lot 1 Civils) of Planning Permission ref: APP/2024/1714 for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    27 Oct 2025 Conditions