Planning application
Former Strathdon Fish Farm Mill Of Newe Strathdon Aberdeenshire AB36 8TG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of Boundary Fence and Gates (Retrospective), Change of Use and Conversion, Alterations and Formation of External Stairs of Mill to Class 9 (Dwellinghouse)
As published by the council, reference APP/2021/0917
Application record
- Reference
- APP/2021/0917
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: External Grant
- Received
- 21 Apr 2021
- Validated
- 22 Apr 2021
- Decided
- 2 Dec 2022
- Ward
- Aboyne, Upper Deeside And Donside
- Parish
- Donside
- Decision by
- Committee
- Postcode
- AB36 8TG
Timeline
Dates from the published record
-
21 Apr 2021
Received by Aberdeenshire
-
22 Apr 2021
Validated
Checked as complete and ready for consideration.
-
2 Dec 2022
Decision issued: External Grant
-
18 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
43 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Aberdeenshire granted permission on 2 December 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ernan Waterside Strathdon Aberdeenshire AB36 8XA
Erection of Double Garage/Store
Granted Full applications 14 docs
Other full applications
In Aberdeenshire
-
APP/2025/1810 Granted
Site Adjacent To Wester Brae Hatton Peterhead
Erection of Dwellinghouse
-
APP/2026/0901 Granted
Land at Woodside of Ardoe Farm Banchory Devenick Aberdeenshire AB12 5XX
Erection of Agricultural Storage Building and Installation of 2 Storage Containers (Part Retrospective)
-
APP/2026/1185 Granted
5 Clio Mews Banchory AB31 5NE
Erection of Dwellinghouse and Garage (Change of House Design and Plot Layout to Plot 3 of Planning Permission Reference APP/2019/1306)
-
APP/2025/0993 Granted
Land To The East Of Buckie Farm Boddam Aberdeenshire AB42 3AJ
Construction of Synchronous Condenser and Associated Infrastructure
-
APP/2026/1068 Granted
Silver Stone Cottage Drumblade Huntly AB54 6EQ
Alterations and Extension to Dwellinghouse