Polhollick Bridge Bridge Of Gairn Ballater Aberdeenshire

Granted Aberdeenshire APP/2017/1340 Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of South Side Steps to Deck and Application of Concrete to Underside of Abutment to Prevent Future Scour

As published by the council, reference APP/2017/1340

Application record

Reference
APP/2017/1340
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Approved
Received
24 May 2017
Validated
24 May 2017
Decided
21 Jul 2017
Ward
Aboyne, Upper Deeside And Donside
Parish
Ballater & Crathie
Decision by
Delegated

Site history

Applications at this address on the Aberdeenshire register

This site has had 4 applications since 2016: 2 approved, 0 refused.

  • APP/2017/1415 Granted

    Polhollick Bridge Bridge Of Gairn Ballater Aberdeenshire

    Removal of South Side Steps to Deck and Application of Concrete to Underside of Abutment to Prevent Future Scour

    Decided 21 Jul 2017 Full applications
  • APP/2017/0108 Withdrawn

    Polhollick Bridge Bridge Of Gairn Ballater Aberdeenshire

    Removal of South Side Steps to Deck, Concrete to Underside of Abutment to Prevent Future Scour

    Decided 10 Feb 2017 Heritage and listed buildings
  • APP/2016/3321 Withdrawn

    Polhollick Bridge Bridge Of Gairn Ballater Aberdeenshire

    Repairs to Bridge

    Decided 10 Feb 2017 Full applications

Timeline

Dates from the published record

  1. 24 May 2017

    Received by Aberdeenshire

  2. 21 Jul 2017

    Decision issued: Approved

  3. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Aberdeenshire granted permission on 21 July 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Aberdeenshire

  • APP/2026/1502 Awaiting decision

    31 Duff Street Macduff AB44 1QL And 48 Gellymill Street Macduff AB44 1TN

    Replacement Windows

    Received 1 Sep, published by the council 3 Sep 2026 Heritage and listed buildings
  • APP/2026/1495 Awaiting decision

    North Lodge Eden House Banff Aberdeenshire AB45 3NT

    Installation of Replacement Windows

    Received 31 Aug, published by the council 2 Sep 2026 Heritage and listed buildings
  • APP/2026/1477 Awaiting decision

    Fasnadarach Dinnet Aboyne Aberdeenshire AB34 5PP

    Internal Alterations

    Received 28 Aug, published by the council 31 Aug 2026 Heritage and listed buildings
  • APP/2026/1148 Granted

    Bucket Mill Finzean Banchory Aberdeenshire AB31 6NE

    Alterations to Existing Weir Including Installation of Cabling, Inlet and Outlet Fish Screens and Rebuilding of Footbridge

    Received 6 Jul, published by the council 28 Jul 2026 Heritage and listed buildings
  • APP/2026/1386 Awaiting decision

    Fetteresso Parish Church Hall Bath Street Stonehaven AB39 2DH

    Alterations to Hall

    14 Aug 2026 Heritage and listed buildings