Skip to content
PlanIndex Get alerts
Menu

Planning application

260710/DPP

Ground Floor Right 28 Portland Street Aberdeen AB11 6LJ

Awaiting decision Aberdeen City Detailed Planning Permission

Proposal

Change of use of flat to short-term let accommodation with maximum occupancy of 4 people

As published by the council, reference 260710/DPP

Timeline

Dates from the published record

  1. 23 Jun 2026

    Received by Aberdeen City

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Aberdeen City for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 260030/DPP Granted

    101 Portland Street Aberdeen AB11 6LN

    Change of use to residential flat

    14 Jan 2026 141m away Full applications
  • 260029/DPP Granted

    105 Portland Street Aberdeen AB11 6LN

    Change of use to residential flat

    14 Jan 2026 141m away Full applications
  • 260789/TEL Granted

    Palmerston Road Ferryhill Aberdeen AB11 5QJ

    Installation of 1no 8M high telecommunication pole

    6 Jul 2026 142m away Telecoms
  • 250964/DPP Granted

    Land At 69 Palmerston Road Aberdeen AB11 5RE

    Construction of electric vehicle charging hub comprising sixteen electric vehicle ultra-rapid (150kw+) charging points, supporting substation infrastructure, grid connection cabling, landscaping, and lighting

    3 Sep 2025 168m away Full applications
  • 250855/DPP Withdrawn

    Antrim Guest House 157 Crown Street Aberdeen AB11 6HT

    Change of use of guest house to short-term let accommodation with maximum occupancy of 12 people

    1 Sep 2025 189m away Full applications
  • 260100/DPP Granted

    Antrim Guest House 157 Crown Street Aberdeen AB11 6HT

    Change of use from bed and breakfast to 6 serviced apartments with ancillary office

    18 Feb 2026 189m away Full applications

In Aberdeen City

  • 260823/DPP Awaiting decision

    60 Union Street Aberdeen AB10 1BB

    Change of use from class 4 (business) to form 7no. suites (class 7 hotels and hostels)

    17 Jul 2026 Full applications
  • 260825/DPP Awaiting decision

    21 Belvidere Crescent Aberdeen AB25 2NH

    Formation of new opening to rear and installation of new windows and doors relocation of RWP and installation of vents to rear with associated works

    17 Jul 2026 Full applications
  • 260095/DPP Granted

    28 Glen Gardens Aberdeen AB21 7FD

    Erection of single storey extension to side

    30 Jan 2026 Full applications
  • 260398/DPP Withdrawn

    Second Floor Right 506 George Street Aberdeen AB25 3XJ

    Change of use of flat to short-term let accommodation with maximum occupancy of 2 people

    8 Apr 2026 Full applications
  • 260076/DPP Granted

    Aberdeen Civil Justice Centre And Commercial Courts Queen Street City Centre Aberdeen AB10 1AN

    Remedial works to external facade and roof (in relation to adjacent demolitions)

    23 Jan 2026 Full applications