Skip to content
PlanIndex Get alerts
Menu

Planning application

408-412 Union Street Aberdeen

Awaiting decision Aberdeen City 260420/DPP Detailed Planning Permission

Works: New dwelling Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Splitting of existing retail unit to form 2no units, 1no retained as class 1A (retail) and 1no change of use to class 3 (food and drink), change of use of upper floors to form 2no flats and formation of new entrance to front

As published by the council, reference 260420/DPP

Application record

Reference
260420/DPP
Type
Detailed Planning Permission
Status
Pending
Received
27 Apr 2026
Validated
27 Apr 2026
Ward
Mid Stocket/Rosemount
Parish
City Centre

Timeline

Dates from the published record

  1. 27 Apr 2026

    Received by Aberdeen City

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 22 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Aberdeen City took a median of 53 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Aberdeen

26 applications on PlanIndex · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Aberdeen City for determination, against a statutory target of eight weeks. Over the last year Aberdeen City decided full applications in a median of 62 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Aberdeen City

  • 260203/DPP Granted

    Redmoss Service Station Wellington Circle Aberdeen AB12 3JG

    Erection of single storey side/rear extension to ancillary retail unit, installation of bin yard enclosure, alterations to ramped access, installation of balustrade, installation of replacement interceptor and connected vent lines and associated works. (Shell UK Retail Ltd.)

    17 Mar 2026 Full applications
  • 260228/DPP Granted

    Land At Treetops Grove The Treetops Development Springfield Road Aberdeen AB15 7SA

    Erection of retaining wall and associated landscaping (retrospective)

    5 Mar 2026 Full applications
  • 260516/DPP Granted

    47 Derbeth Park Aberdeen AB15 8TU

    Erection of first floor extension above existing garage to side

    7 May 2026 Full applications
  • 251217/DPP Granted

    Unit 14B And 15 Peterseat Drive Aberdeen AB12 3HT

    Change of use to vehicle sales and repair facility including alteration and extension to existing building. External works including formation of associated vehicle display area, parking, hard surfacing, wash bay, bin store and security fencing (Retrospective.)

    28 Nov 2025 Full applications
  • 251292/DPP Granted

    Exceed Energy 1 Rubislaw Terrace Aberdeen AB10 1XE

    Installation of replacement windows (retrospective)

    24 Nov 2025 Full applications