Planning application

Drumforskie Stonehaven Road Aberdeen AB12 5XJ

Awaiting decision Aberdeen City 260004/ESC EIA Screening Request

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 5,678 JA Solar 445W panels ground-mounted solar array panels on galvanised metal frames and associated works. (Forster Group Ltd)

As published by the council, reference 260004/ESC

Application record

Reference
260004/ESC
Type
EIA Screening Request
Status
Pending
Received
24 Dec 2025
Validated
24 Dec 2025
Ward
Kincorth/Nigg/Cove
Parish
Nigg
Postcode
AB12 5XJ

Site history

Applications at this address on the Aberdeen City register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 251307/DPP Granted

    Drumforskie Stonehaven Road Aberdeen AB12 5XJ

    Installation of 5,678 ground mounted solar panels with total generating capacity of 2MW on galvanised metal frames and associated works. (Forster Group Ltd.)

    Decided 11 Sep 2026

Timeline

Dates from the published record

  1. 24 Dec 2025

    Received by Aberdeen City

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 18 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Aberdeen City took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Aberdeen City for determination, against a statutory target of eight weeks. Over the last year Aberdeen City's median decision took 53 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Aberdeen City

  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    Received 7 May, published by the council 22 Jul 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    Received 29 Apr, published by the council 22 Jul 2026 Outline
  • 250930/S36 Decided

    Green Volt Offshore Windfarm East Of Aberdeenshire Coast

    Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall

    Received 27 Aug, published by the council 22 Jul 2026 Outline