Planning application
250850/DPP
45 Huntly Street Aberdeen AB10 1TH
Proposal
Installation of replacement doors and fascias to front and rear
As published by the council, reference 250850/DPP
Timeline
Dates from the published record
-
15 Aug 2025
Received by Aberdeen City
-
14 Oct 2025
Decision issued: Approve Conditionally
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
250899/PNW Granted
45 Huntly Street Aberdeen
Replacement of existing brown uPVC tilt and turn windows with white tilt and turn uPVC framed windows
-
260081/PNW Granted
Ab1 48 Huntly Street Aberdeen AB10 1SH
Replacement of brown aluminium framed, one over one sash and case windows with grey aluminium framed windows, top light fixed, bottom light top hung with the design and proportions to match existing
-
260020/DPP Granted
AB1 Building 48 Huntly Street Aberdeen AB10 1SH
Installation of 2 chiller units to roof
-
260525/DPP Awaiting decision
17 Golden Square Ground Floor Flat Aberdeen AB10 1RH
Installation of replacement fanlight and freestanding bicycle storage box to front (retrospective)
-
260541/ADV Awaiting decision
220 Union Street Aberdeen AB10 1TL
Installation of 1 illuminated fascia sign; non-illuminated branded window blinds and poster holder (retrospective)
-
260542/LBC Awaiting decision
220 Union Street Aberdeen AB10 1TL
Alterations to a shop front including painting of timber surround from blue-grey to dark grey and installation of 1 illuminated fascia sign; non-illuminated branded window blinds and poster holder (retrospective)
Other full applications applications
In Aberdeen City
-
260823/DPP Awaiting decision
60 Union Street Aberdeen AB10 1BB
Change of use from class 4 (business) to form 7no. suites (class 7 hotels and hostels)
-
260825/DPP Awaiting decision
21 Belvidere Crescent Aberdeen AB25 2NH
Formation of new opening to rear and installation of new windows and doors relocation of RWP and installation of vents to rear with associated works
-
260095/DPP Granted
28 Glen Gardens Aberdeen AB21 7FD
Erection of single storey extension to side
-
260398/DPP Withdrawn
Second Floor Right 506 George Street Aberdeen AB25 3XJ
Change of use of flat to short-term let accommodation with maximum occupancy of 2 people
-
260076/DPP Granted
Aberdeen Civil Justice Centre And Commercial Courts Queen Street City Centre Aberdeen AB10 1AN
Remedial works to external facade and roof (in relation to adjacent demolitions)