Planning application
271 King Street Aberdeen AB24 5AN
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to a shop front including installation of front doors and installation of extract canopy and flue, 3 wall mounted air conditioning units with associated works (retrospective)
As published by the council, reference 230183/DPP
Application record
- Reference
- 230183/DPP
- Type
- Detailed Planning Permission
- Status
- Approved
- Decision
- Granted As published: Approve Conditionally
- Received
- 20 Feb 2023
- Validated
- 20 Feb 2023
- Decided
- 23 May 2023
- Ward
- George Street/Harbour
- Parish
- Castlehill And Pittodrie
- Decision by
- Delegated Decision
- Postcode
- AB24 5AN
Site history
Applications at this address on the Aberdeen City register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
230184/ADV Granted
271 King Street Aberdeen AB24 5AN
Installation of 1 illuminated box sign and 2 illuminated lettering signs
Timeline
Dates from the published record
-
20 Feb 2023
Received by Aberdeen City
-
23 May 2023
Decision issued: Approve Conditionally
-
22 Nov 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Raymond Simpson Associates Ltd Agent, registered in Aberdeen
Dissolved · incorporated 2002 · Aberdeen
28 applications on PlanIndex · across 3 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
22 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Aberdeen City granted permission on 23 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
271 King Street Aberdeen AB24 5AN
Installation of 1 illuminated box sign and 2 illuminated lettering signs
Granted Advertising 10 docs -
Flat D 291 King Street Aberdeen AB24 5AN
Change of use of flat to short-term let accommodation with maximum occupancy of 4 people
Granted Full applications 10 docs -
Gibb Tools Ltd 303 - 305 King Street Aberdeen AB24 5AP
92% historically approved · decision due ~17 Nov
Erection of single storey side extension, formation of doorway, infill shutter door, replacement glazed screen and associated works
Awaiting decision Full applications Extension Windows or glazing 10 docsSmall domestic -
303 - 305 King Street Aberdeen AB24 5AP
Change of use of part of the ground floor area from class 6 (storage and distribution) to class 1A (shops and financial, professional and other services) to a mixed use development, roller door infill with cladding and installation of framed glazing to existing canopy
Granted Full applications Extension Windows or glazing 13 docs -
Morrisons 215 King Street Aberdeen AB24 5DA
93% historically approved · decision due ~9 Jul
Installation of charging zone, erection of EV chargers, sub-station enclosure, locker hub and associated works
Decided -
Flat B 14 Roslin Terrace Aberdeen AB24 5LJ
Change of use of flat to Short Term Let accommodation (sui generis) with maximum occupancy of 4 people
Refused Full applications 9 docs
Other full applications
In Aberdeen City
-
261002/DPP Withdrawn
82 Hillview Road Peterculter Aberdeen AB14 0UB
Formation of French door from an existing window opening to rear
-
261146/DPP Withdrawn
6 Thom's Place Aberdeen AB24 3EW
Change of use to HMO including the installation of roof lights, extract vents, conversion of window opening to form access door and formation of access path (retrospective)
-
260911/DPP Granted
Subsea7 Greenwell Road Aberdeen AB12 3AX
Installation of 1 stand-alone steel portal frame workshop.
-
261083/DPP Granted
Streamline Shipping Agencies Ltd Palmerston Quay Aberdeen AB11 5FG
Erection of 2 storey modular office building to yard and associated works
-
251403/DPP Granted
Man Erf Truck Centre Minto Road Aberdeen AB12 3LU
Partial demolition of existing unit and erection of maintenance facility for large commercial vehicles (Use Class 5/6) with ancillary office, administrative space and external service yard including alterations to yard levels, formation of retaining wall, associated boundary works, vehicle parking and landscaping.