Skip to content
PlanIndex Get alerts
Menu

Planning application

Vacant Site Adjacent To 291 Stoneywood Road Dyce AB21 9JS

Granted Aberdeen City 201499/PPP Planning Permission in Principle

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of dwelling house with associated works (Renewal of planning permission in principle ref. P151920)

As published by the council, reference 201499/PPP

Application record

Reference
201499/PPP
Type
Planning Permission in Principle
Status
Approved
Decision
Approve Conditionally
Received
1 Dec 2020
Validated
1 Dec 2020
Decided
25 Aug 2021
Ward
Dyce/Bucksburn/Danestone
Parish
Dyce And Stoneywood - Pre Review 2024
Decision by
Delegated Decision
Postcode
AB21 9JS

Timeline

Dates from the published record

  1. 1 Dec 2020

    Received by Aberdeen City

  2. 25 Aug 2021

    Decision issued: Approve Conditionally

  3. 21 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

14 applications on PlanIndex · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • Alba Gate Stoneywood Park Aberdeen AB21 7DZ

    260114/DPP Submitted 2 Feb 2026 143m away

    93% historically approved · decision due ~30 Mar

    Re-development of site to include change of use to form a mixed-use of four business units (class 4), two cafe/restaurant units (class 3), one with drive thru takeaway (sui generis), electric vehicle charging hub, car parking, soft landscaping and associated works

    Awaiting decision Full applications 21 docs
  • Alba Gate Stoneywood Park Aberdeen AB21 7DZ

    200833/DPP Submitted 22 Jul 2020 152m away

    Re-development including the change of use and extension of the existing building to a mixed use unit which accommodates 50 residential units, co-working office space and cafe/bar and the erection of commercial unit to accommodate co-working and makers' space and a gym and associated works

    Granted Full applications Extension 78 docs
  • 22 Polo Gardens Aberdeen AB21 9JU

    251115/DPP Submitted 13 Oct 2025 186m away

    Installation of modular ramp with balustrade, gate and external steps to front

    Granted Full applications 9 docs
  • 275 Stoneywood Road Aberdeen AB21 9JS

    260753/ADV Submitted 3 Jul 2026 211m away

    84% historically approved · decision due ~28 Aug

    Installation of 1 illuminated fascia sign, 1 illuminated gable sign and 1 illuminated menu box

    Decided Advertising
  • Telecommunications Site Wellheads Place Dyce Aberdeen AB21 7GB

    230166/TEL Submitted 9 Feb 2023 214m away

    Proposed upgrade to the existing telecommunications apparatus

    Granted Telecoms 7 docs
  • Evolve International Safety Training Wellheads Crescent Aberdeen AB21 7GA

    250815/DPP Submitted 4 Aug 2025 264m away

    Installation of solar panels to roof

    Granted Full applications 22 docs

In Aberdeen City

  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    7 May 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    29 Apr 2026 Outline
  • 260211/ESC Decided

    Cityview Craigshaw Drive Aberdeen AB12 3BE

    Proposed demolition of offices and associated structures

    27 Feb 2026 Outline
  • 260033/ESC Decided

    Old Wellington Road/Old Stonehaven Road/Cove Road Aberdeen

    Proposed upgraded travel facilities to include footway, cycle track and all associated works

    20 Jan 2026 Outline
  • 260070/S36 Awaiting decision

    MarramWind Ltd 75 And 110 Kilometres Off The North-east Coast Of Scotland

    Construction and operation of generating station comprise up to 225 wind turbines, associated floating units (including mooring lines and anchors), array cables, subsea distribution centres and cable and scour protection