Planning application
Vacant Site Adjacent To 291 Stoneywood Road Dyce AB21 9JS
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of dwelling house with associated works (Renewal of planning permission in principle ref. P151920)
As published by the council, reference 201499/PPP
Application record
- Reference
- 201499/PPP
- Type
- Planning Permission in Principle
- Status
- Approved
- Decision
- Granted As published: Approve Conditionally
- Received
- 1 Dec 2020
- Validated
- 1 Dec 2020
- Decided
- 25 Aug 2021
- Ward
- Dyce/Bucksburn/Danestone
- Parish
- Dyce And Stoneywood - Pre Review 2024
- Decision by
- Delegated Decision
- Postcode
- AB21 9JS
Timeline
Dates from the published record
-
1 Dec 2020
Received by Aberdeen City
-
25 Aug 2021
Decision issued: Approve Conditionally
-
21 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Neil Rothnie Architecture Agent, an architecture practice
14 applications on PlanIndex · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Aberdeen City granted permission on 25 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Alba Gate Stoneywood Park Aberdeen AB21 7DZ
92% historically approved · decision due ~30 Mar
Re-development of site to include change of use to form a mixed-use of four business units (class 4), two cafe/restaurant units (class 3), one with drive thru takeaway (sui generis), electric vehicle charging hub, car parking, soft landscaping and associated works
Awaiting decision Full applications 21 docs -
Alba Gate Stoneywood Park Aberdeen AB21 7DZ
Re-development including the change of use and extension of the existing building to a mixed use unit which accommodates 50 residential units, co-working office space and cafe/bar and the erection of commercial unit to accommodate co-working and makers' space and a gym and associated works
Granted Full applications Extension 78 docs -
22 Polo Gardens Aberdeen AB21 9JU
Installation of modular ramp with balustrade, gate and external steps to front
Granted Full applications 9 docs -
275 Stoneywood Road Aberdeen AB21 9JS
Installation of 1 illuminated fascia sign, 1 illuminated gable sign and 1 illuminated menu box
Granted Advertising -
Telecommunications Site Wellheads Place Dyce Aberdeen AB21 7GB
Proposed upgrade to the existing telecommunications apparatus
Granted Telecoms 7 docs -
Evolve International Safety Training Wellheads Crescent Aberdeen AB21 7GA
Installation of solar panels to roof
Granted Full applications 22 docs
Other outline applications
In Aberdeen City
-
260998/S37 Awaiting decision
Kintore To Dyce Overhead Northern Circuit Aberdeen
Reconductoring of approximately 10 km of the existing 132kV Kintore-Dyce overhead northern circuit, replacement of all associated fittings (including insulator sets) and the replacement of Tower KD37 with 2no new suspension towers
-
260664/S36 Awaiting decision
Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast
Construction and operation of generating station
-
260663/S36 Awaiting decision
Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast
Construction and operation of generating station
-
260550/S36 Awaiting decision
Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast
Construction and operation of generating station
-
260495/S37 Awaiting decision
Peterhead, Persley And Kintore
Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV