Planning application
A J T Engineering Ltd Blackness Road Aberdeen AB12 3LH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of storage shed building with associated works
As published by the council, reference 201408/DPP
Application record
- Reference
- 201408/DPP
- Type
- Detailed Planning Permission
- Status
- Approved
- Decision
- Approve Unconditionally
- Received
- 16 Nov 2020
- Validated
- 16 Nov 2020
- Decided
- 10 Dec 2020
- Ward
- Kincorth/Nigg/Cove
- Parish
- Cove And Altens
- Decision by
- Delegated Decision
- Postcode
- AB12 3LH
Timeline
Dates from the published record
-
16 Nov 2020
Received by Aberdeen City
-
10 Dec 2020
Decision issued: Approve Unconditionally
-
21 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a surveying firm
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Unit 1 Souter Head Road Aberdeen
Erection of washbay and compressor housing and associated works
Granted Full applications 11 docs -
Unit 1 Souter Head Road Aberdeen
Erection of 1 non-illuminated fascia sign
Granted Advertising 6 docs -
Arco Ltd Blackness Road Aberdeen AB12 3LH
94% historically approved · decision due ~20 Oct
Installation of new window and installation of replacement glazed screen entrance
Awaiting decision Windows or glazing -
Block 1 Unit 3 Souter Head Industrial Units Souter Head Road Aberdeen AB12 3LF
Change of use of existing industrial unit to personal training facility gymnasium (Class 11 assembly and leisure use).
Granted Full applications 19 docs -
Swire House Souter Head Road Aberdeen AB12 3LF
Erection of temporary timber hoarding to boundary
Granted Full applications 10 docs -
Northwards Ltd Blackness Road Aberdeen AB12 3LH
Prior Notification (Demolition) of complete demolition of office building
Granted Prior approval Demolition 6 docs
Other full applications applications
In Aberdeen City
-
260203/DPP Granted
Redmoss Service Station Wellington Circle Aberdeen AB12 3JG
Erection of single storey side/rear extension to ancillary retail unit, installation of bin yard enclosure, alterations to ramped access, installation of balustrade, installation of replacement interceptor and connected vent lines and associated works. (Shell UK Retail Ltd.)
-
260228/DPP Granted
Land At Treetops Grove The Treetops Development Springfield Road Aberdeen AB15 7SA
Erection of retaining wall and associated landscaping (retrospective)
-
260516/DPP Granted
47 Derbeth Park Aberdeen AB15 8TU
Erection of first floor extension above existing garage to side
-
251217/DPP Granted
Unit 14B And 15 Peterseat Drive Aberdeen AB12 3HT
Change of use to vehicle sales and repair facility including alteration and extension to existing building. External works including formation of associated vehicle display area, parking, hard surfacing, wash bay, bin store and security fencing (Retrospective.)
-
251292/DPP Granted
Exceed Energy 1 Rubislaw Terrace Aberdeen AB10 1XE
Installation of replacement windows (retrospective)