Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Mill Park Crescent Stoneywood Aberdeen Aberdeen City AB21 9FE

Granted Aberdeen City 201396/DPP Detailed Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of sun room to rear (retrospective)

As published by the council, reference 201396/DPP

Application record

Reference
201396/DPP
Type
Detailed Planning Permission
Status
Approved
Decision
Approve Unconditionally
Received
12 Nov 2020
Validated
12 Nov 2020
Decided
28 Jan 2021
Ward
Dyce/Bucksburn/Danestone
Parish
Dyce And Stoneywood - Pre Review 2024
Decision by
Delegated Decision
Postcode
AB21 9FE

Timeline

Dates from the published record

  1. 12 Nov 2020

    Received by Aberdeen City

  2. 28 Jan 2021

    Decision issued: Approve Unconditionally

  3. 21 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Aberdeenshire

8 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • O/S And RH Of Greenburn Lodge Waterton Road Aberdeen AB21 9HS

    260995/TEL Submitted 25 Aug 2026 223m away

    98% historically approved · decision due ~20 Oct

    Installation of 2no 9M high telecommunication poles

    Decided Telecoms
  • S2 Stoneywood Estate Stoneywood Aberdeen AB21 9LA

    200196/MSC Submitted 14 Feb 2020 240m away

    Approval of matters specified in conditions (1): (i-access), (ii-siting), (iii-siting design), (iv-landscaping), 10 (SUDS) and 14 (waste management) for planning permission in principle ref. P110790 for the erection of cafe (class 3) with outdoor seating area

    Granted Conditions 23 docs
  • 215 Stoneywood Road Aberdeen AB21 9JD

    221200/DPP Submitted 12 Oct 2022 405m away

    Demolition of existing building and erection of 2 semi-detached dwellinghouses and associated infrastructure

    Granted Full applications Demolition 23 docs
  • Craighaar Stoneywood Terrace Aberdeen AB21 9JT

    201498/DPP Submitted 2 Dec 2020 430m away

    Incorporation of existing annexe into existing dwellinghouse (Class 9) (retrospective)

    Granted Full applications 7 docs
    Domestic
  • Craighaar Stoneywood Terrace Aberdeen AB21 9JT

    210555/PPP Submitted 28 Apr 2021 430m away

    Erection of dwelling house including sub-division of existing feu

    Withdrawn Outline New dwelling 13 docs
    Domestic
  • Craighaar Stoneywood Terrace Aberdeen AB21 9JT

    200733/CLE Submitted 30 Jun 2020 430m away

    Existing use of the premises as residential (domestic) annexe accommodation

    Refused Lawful development 6 docs

In Aberdeen City

  • 260203/DPP Granted

    Redmoss Service Station Wellington Circle Aberdeen AB12 3JG

    Erection of single storey side/rear extension to ancillary retail unit, installation of bin yard enclosure, alterations to ramped access, installation of balustrade, installation of replacement interceptor and connected vent lines and associated works. (Shell UK Retail Ltd.)

    17 Mar 2026 Full applications
  • 260228/DPP Granted

    Land At Treetops Grove The Treetops Development Springfield Road Aberdeen AB15 7SA

    Erection of retaining wall and associated landscaping (retrospective)

    5 Mar 2026 Full applications
  • 260516/DPP Granted

    47 Derbeth Park Aberdeen AB15 8TU

    Erection of first floor extension above existing garage to side

    7 May 2026 Full applications
  • 251217/DPP Granted

    Unit 14B And 15 Peterseat Drive Aberdeen AB12 3HT

    Change of use to vehicle sales and repair facility including alteration and extension to existing building. External works including formation of associated vehicle display area, parking, hard surfacing, wash bay, bin store and security fencing (Retrospective.)

    28 Nov 2025 Full applications
  • 251292/DPP Granted

    Exceed Energy 1 Rubislaw Terrace Aberdeen AB10 1XE

    Installation of replacement windows (retrospective)

    24 Nov 2025 Full applications