Skip to content
PlanIndex Get alerts
Menu

Planning application

Mast At Hareness Road Aberdeen

Granted Aberdeen City 201313/TEL Courtesy Notification - Telecomms

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Upgrade to the existing telecommunications apparatus. (EE UK Ltd. and Three UK Ltd.)

As published by the council, reference 201313/TEL

Application record

Reference
201313/TEL
Type
Courtesy Notification - Telecomms
Status
Determined
Decision
Permitted Development
Received
28 Oct 2020
Validated
28 Oct 2020
Decided
19 Nov 2020
Ward
Kincorth/Nigg/Cove
Parish
Cove And Altens
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 28 Oct 2020

    Received by Aberdeen City

  2. 19 Nov 2020

    Decision issued: Permitted Development

  3. 21 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a telecoms contractor registered in Leeds

307 applications on PlanIndex · across 93 councils · 85% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • Energy Works Hareness Road Aberdeen AB12 3LE

    260137/ADV Submitted 27 Feb 2026 95m away

    Installation of 2 illuminated totem signs. (ETZ Ltd.)

    Granted Advertising 5 docs
  • 54 Hareness Road Altens Aberdeen AB12 3LE

    261000/ADV Submitted 2 Sep 2026 95m away

    84% historically approved · decision due ~28 Oct

    Installation of 3 illuminated box signs

    Awaiting decision Advertising
  • 54 Hareness Road Altens Aberdeen AB12 3LE

    260986/DPP Submitted 27 Aug 2026 95m away

    94% historically approved · decision due ~22 Oct

    Installation of overcladding, roller shutters, doors and replacement rooflights, change of colour to external finishes, replacement of hardcore with tarmac, removal of steelwork frame and associated works

    Awaiting decision Loft or dormer
  • A B B Ltd Hareness Road Aberdeen AB12 3LE

    250856/CLP Submitted 22 Aug 2025 185m away

    Proposed installation of solar PV panels to roof/external fabric

    Decided Lawful development 11 docs
  • Man Erf Truck Centre Minto Road Aberdeen AB12 3LU

    251403/DPP Submitted 23 Dec 2025 272m away

    93% historically approved · decision due ~17 Feb

    Partial demolition of existing unit and erection of maintenance facility for large commercial vehicles (Use Class 5/6) with ancillary office, administrative space and external service yard including alterations to yard levels, formation of retaining wall, associated boundary works, vehicle parking and landscaping.

    Awaiting decision Full applications Demolition 64 docs
  • Phase 1 Unit 5 Altens Trade Centre Hareness Circle Aberdeen AB12 3LY

    260890/DPP Submitted 12 Aug 2026 274m away

    94% historically approved · decision due ~7 Oct

    Change of use from van hire (sui generis) to class 5 (general Industrial)

    Awaiting decision

In Aberdeen City

  • 261025/TEL Awaiting decision

    Side Of Walker Technical Resources Ltd Shielhill Road Aberdeen AB23 8NN

    Installation of 1no 10M high telecommunication pole

    Telecoms
  • 261026/TEL Awaiting decision

    R/o 21 And 23 Kepplehills Drive Aberdeen AB21 9PS

    Installation of 1no 7M high telecommunication pole

    Telecoms
  • 261006/TEL Decided

    O/S 2 Hopecroft Drive And 2 Hopecroft Terrace Aberdeen AB21 9RJ

    Installation of 1no 9M and 1no 8M high telecommunication poles

    Telecoms
  • 261001/TEL Awaiting decision

    108 Brighton Place Ashley Aberdeen AB10 6SU

    Installation of 1no 11M high telecommunication pole

    Telecoms
  • 260992/TEL Decided

    O/s 15 Crossgates O/S 13 Crossgates Opp 24 Crossgates O/S 19 Crossgates Aberdeen AB21 9EF

    Installation of 4no 8M high telecommunication poles

    Telecoms