Skip to content
PlanIndex Get alerts
Menu

Planning application

17-19 Windmill Brae Aberdeen AB11 6HU

Granted Aberdeen City 200846/DPP Detailed Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial change of use from nightclub (Class 11) to public bar (Sui Generis) and formation of beer garden to rear with associated works

As published by the council, reference 200846/DPP

Application record

Reference
200846/DPP
Type
Detailed Planning Permission
Status
Approved
Decision
Approve Conditionally
Received
28 Jul 2020
Validated
28 Jul 2020
Decided
25 Nov 2020
Ward
Torry/Ferryhill
Parish
City Centre
Decision by
Delegated Decision
Postcode
AB11 6HU

Timeline

Dates from the published record

  1. 28 Jul 2020

    Received by Aberdeen City

  2. 25 Nov 2020

    Decision issued: Approve Conditionally

  3. 21 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Angus

35 applications on PlanIndex · across 3 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17-19 Windmill Brae Aberdeen AB11 6HU

    200845/ADV Submitted 28 Jul 2020 0m away

    Installation of 7 non-illuminated glazing vinyl's

    Granted Advertising Windows or glazing 5 docs
  • 181A Union Street Aberdeen AB11 6BB

    201623/ADV Submitted 5 Jan 2021 61m away

    Installation of 1 illuminated fascia sign and 1 illuminated projecting sign

    Granted Advertising 8 docs
  • 181 Union Street Aberdeen AB11 6BB

    200474/DPP Submitted 20 Apr 2020 61m away

    Change of use of existing offices on basement, first, second & third floors to form 17no. residential flats with car parking and associated works, including replacement windows

    Granted Full applications New dwelling Windows or glazing 78 docs
  • 181A Union Street Aberdeen AB11 6BB

    201624/LBC Submitted 22 Dec 2020 62m away

    Installation of 1 illuminated fascia sign and 1 illuminated projecting sign and internal alteration including installation of wall partitions and doors with associated works

    Granted Heritage and listed buildings 8 docs
  • 57 Crown Street Aberdeen AB11 6EX

    210194/DPP Submitted 15 Feb 2021 62m away

    Change of use from class 4 (offices) to form 3no. residential flats and conversion and extension of outbuilding to form dwelling house including formation of dormer and roof repairs with associated works

    Granted Full applications New dwelling Extension +1 55 docs
    Small domestic
  • First Floor Flat 9 Crown Street Aberdeen AB11 6HA

    250763/DPP Submitted 29 Jul 2025 62m away

    93% historically approved · decision due ~23 Sep

    Change of use to residential flat (sui generis)

    Awaiting decision Full applications 15 docs

In Aberdeen City

  • 260203/DPP Granted

    Redmoss Service Station Wellington Circle Aberdeen AB12 3JG

    Erection of single storey side/rear extension to ancillary retail unit, installation of bin yard enclosure, alterations to ramped access, installation of balustrade, installation of replacement interceptor and connected vent lines and associated works. (Shell UK Retail Ltd.)

    17 Mar 2026 Full applications
  • 260228/DPP Granted

    Land At Treetops Grove The Treetops Development Springfield Road Aberdeen AB15 7SA

    Erection of retaining wall and associated landscaping (retrospective)

    5 Mar 2026 Full applications
  • 260516/DPP Granted

    47 Derbeth Park Aberdeen AB15 8TU

    Erection of first floor extension above existing garage to side

    7 May 2026 Full applications
  • 251217/DPP Granted

    Unit 14B And 15 Peterseat Drive Aberdeen AB12 3HT

    Change of use to vehicle sales and repair facility including alteration and extension to existing building. External works including formation of associated vehicle display area, parking, hard surfacing, wash bay, bin store and security fencing (Retrospective.)

    28 Nov 2025 Full applications
  • 251292/DPP Granted

    Exceed Energy 1 Rubislaw Terrace Aberdeen AB10 1XE

    Installation of replacement windows (retrospective)

    24 Nov 2025 Full applications