Site At Silverburn House Claymore Drive Aberdeen AB23 8GD

Granted Aberdeen City 191904/PPP Planning Permission in Principle

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of residential led, mixed use development of around 100 to 150 units (mix of house types and flats), including facilities consisting of up to 500 sqm of commercial floorspace (within classes 1(shops), 2(financial, professional and other services) and/or class 3(food and drink)) with associated works

As published by the council, reference 191904/PPP

Application record

Reference
191904/PPP
Type
Planning Permission in Principle
Status
Approved
Decision
Granted As published: Approve Conditionally & Legal Agreement
Received
3 Jan 2020
Validated
3 Jan 2020
Decided
22 Sep 2022
Ward
Bridge Of Don
Parish
Bridge Of Don
Decision by
Committee
Postcode
AB23 8GD

Site history

Applications at this address on the Aberdeen City register

This site has had 2 applications since 2020: 2 approved, 0 refused.

  • 241301/MSC Granted

    Site At Silverburn House Claymore Drive Aberdeen AB23 8GD

    Approval of matters specified in conditions 2a (siting design), 2j (landscaping, planting, screening) and 3 (landscaping information) amended landscaping proposals in relation to Planning Permission in Principle (Ref: 191904/PPP) for the erection of 67 homes, supporting infrastructure and open space

    Decided 30 Jan 2025 Conditions

Timeline

Dates from the published record

  1. 3 Jan 2020

    Received by Aberdeen City

  2. 22 Sep 2022

    Decision issued: Approve Conditionally & Legal Agreement

  3. 21 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Space Solutions Agent

39 applications on PlanIndex · across 11 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

48 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Aberdeen City granted permission on 22 September 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Claymore Drive Bridge Of Don Aberdeen AB23 8GD

    240839/MSC Submitted 9 Jul 2024 50 yards away

    Approval of matters specified in conditions 1 (phasing), 2 (detailed design), 3 (landscaping information), 4 (trees), 5 (drainage), 6 (historic drainage), 7 (SUDS), 8 (de-culverting/realignment), 9 (flood risk assessment), 10 (environmental enhancements), 11 (CEMP), 12 (street design), 13 (pedestrian crossing), 14 (traffic regulation orders), 15 (bus stops), 16 (safe routes), 17 (residential travel pack), 18 (noise assessment/mitigation measures), 19 (dust risk assessment), 20 (commercial floorspace), 21 and 22 (contaminated land) and 23 (carbon reduction/water efficiency) in relation to Planning Permission in Principle (Ref: 191904/PPP) for the erection of 67 homes, supporting infrastructure and open space

    Granted Conditions Trees 152 docs
  • Site At Silverburn House Claymore Drive Aberdeen AB23 8GD

    241301/MSC Submitted 12 Nov 2024 50 yards away

    Approval of matters specified in conditions 2a (siting design), 2j (landscaping, planting, screening) and 3 (landscaping information) amended landscaping proposals in relation to Planning Permission in Principle (Ref: 191904/PPP) for the erection of 67 homes, supporting infrastructure and open space

    Granted Conditions 26 docs
  • Exhibition Avenue Bridge Of Don Aberdeen AB23 8BL

    151086 Submitted 15 Jul 2015 150 yards away

    Installation of Illuminated Totem Sign

    Withdrawn Advertising 2 docs
  • Holiday Inn Exhibition Avenue AB23 8BL

    151087 Submitted 15 Jul 2016 150 yards away

    Installation of 7 flagpoles for display of advert (7.05 metres high).

    Withdrawn Advertising 2 docs
  • Land To East Of Exhibition Avenue Bridge Of Don Aberdeen AB23 8BL

    260010/ADV Submitted 15 Jan 2026 200 yards away

    Installation of 1 non-illuminated free standing sign

    Granted Advertising 9 docs
  • King's Church King's Way Bridge Of Don Aberdeen AB23 8BL

    241017/DPP Submitted 4 Sep 2024 200 yards away

    Installation of boiler flue

    Granted Full applications 13 docs

In Aberdeen City

  • 260998/S37 Awaiting decision

    Kintore To Dyce Overhead Northern Circuit Aberdeen

    Reconductoring of approximately 10 km of the existing 132kV Kintore-Dyce overhead northern circuit, replacement of all associated fittings (including insulator sets) and the replacement of Tower KD37 with 2no new suspension towers

    Received 24 Aug, published by the council 27 Aug 2026 Outline
  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    Received 7 May, published by the council 22 Jul 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    Received 29 Apr, published by the council 22 Jul 2026 Outline