Plumbers · M9
13 potential projects within 5 miles of M9.
From the planning register, over the last 12 months, matched to the work plumbers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 12 |
| Householder | 1 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Salford Central Railway Station, New Bailey Street, Salford, M3 5ET
Change of use of Arch 1 and associated colonnade area to flexible Class E use (Commercial, Business and Service) and use as a sui generis drinking establishment with expanded food provision, together with: external and internal refurbishment works including alterations to the front and rear elevations; remedial and cleaning works; external landscaping; installation of external lighting, drainage and ventilation infrastructure; and associated access improvements (including connections into Salford Central station) and cycle parking provision
Granted Full applications 37 docs -
Land Bounded By Surface Level Car Parking To The West, Travis Street To The South, The Junction Between Fairfield Street And Neild Street To The East And Fairfield Street To The North Manchester
Creation of public realm works including re-grading and re-surfacing footpaths, highways, soft landscaping and planting of trees, replacement and reprovision of street lighting, CCTV, and street furniture, removal of car parking spaces, drainage, and associated works.
Granted Full applications Trees 28 docs -
4 ST ANNE'S GARDENS, HEYWOOD, OL10 1QG
Single storey front and side extension to facilitate new porch, garage and shower room following demolition of existing detached garage
Granted Householder Extension Demolition 6 docsSmall domestic -
BOWLEE PLAYING FIELDS, HEYWOOD OLD ROAD, MIDDLETON, MANCHESTER, M24 4SD
85% historically approved · decision due ~9 Oct
Demolition and replacement of community centre to provide Community Sports and Wellbeing Hub (Hybrid Use Class F2/E(d)) comprising community sports and wellbeing facilities; football club training and community pitches; drainage and earthworks; provision of cricket nets; with associated hard and soft landscaping, parking, storage container, lighting, enclosures and boundary treatments.
Awaiting decision Full applications Demolition 50 docs -
PICCADILLY GARDENS PICCADILLY MANCHESTER M1 1LS
80% historically approved · decision due ~8 Oct
City Council Development - Redevelopment and reconfiguration of Piccadilly Gardens comprising works to the public realm including public open space and use of space for events, together with decommissioning and removal of the existing fountain; creation of play space, lawn area, hard and soft landscaping; lighting; and drainage and other associated infrastructure; and a severable plot for a future ancillary structure with associated interim landscaping.
Awaiting decision Full applications 46 docs -
Ashton Community Fire Station Slate Lane Audenshaw Tameside M34 5FS
91% historically approved · decision due ~22 Sep
Implementation of a water source heat pump and an ASHP to replace the existing natural gas powered boiler and associated works.
Awaiting decision Full applications 14 docs
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.