Skip to content
PlanIndex Get alerts
Menu

Electricians · CH65

7 potential projects within 5 miles of CH65.

From the planning register, over the last 12 months, matched to the work electricians do. Every one of these is a real application at a real address.

7 Applications near you Within 5 miles of CH65, over the last 12 months
1 Already approved Permission granted. Most have nobody booked yet.
1 Kinds of work Matched to what a electrician does

Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.

What kind of work it is

Over the last 12 months

Kind of applicationNear you
Full applications 7

A few of them

Approvals first, because an approval is a budget looking for a builder

  • Hawthorne Dene Old Hall Lane Puddington Neston CH64 5SP

    26/01121/FUL Submitted 10 Apr 2026 Cheshire West and Chester

    To install an air source heat pump to rear garden.

    Granted Full applications 10 docs
  • Ellesmere Port Fire Station Wellington Road Ellesmere Port CH65 0EZ

    26/02443/FUL Submitted 4 Aug 2026 Cheshire West and Chester

    92% historically approved · decision due ~23 Oct

    Part demolition of existing Fire Station. Single storey extension, erection of substation, installation of solar panels, and alterations to remaining site including installation of security fencing,

    Awaiting decision Full applications Extension Demolition
    Small domestic
  • The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL

    26/02179/FUL Submitted 14 Jul 2026 Cheshire West and Chester

    92% historically approved · decision due ~23 Oct

    Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure. The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities. In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital. 1. New Energy Generation Compound Construction of a new Energy Generation Compound housing: ? 2 No. 5MW high efficiency gas-fired LTHW boilers ? 1 No. 11m high chimney and associated flue arrangements ? Pressurisation systems ? Expansion plant ? Water treatment equipment ? Associated mechanical services ? Building management systems ? Electrical infrastructure 2. Distribution Infrastructure Construction of: ? New primary LTHW distribution network ? Interconnecting pipework systems 3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems) ? Creche ? Longhouse ? Martindale House ? Moston Lodge ? EDTC & Postgraduate 4. Substation Construction of a new Substation housing: ? Transformer ? LV Switchboard

    Awaiting decision Full applications
  • Ellesmere Port Catholic High School Capenhurst Lane Whitby Ellesmere Port CH65 7AQ

    26/01344/FUL Submitted 5 May 2026 Cheshire West and Chester

    92% historically approved · decision due ~3 Jul

    Demolition of existing buildings and erection of two new school buildings, stand-alone canopies, installation of solar panels, new vehicular, pedestrian and cycle access points from Overpool Road, new car park, cycle storage and relocated police layby, reconfigured access and car parking provision for Our Lady Star of the Sea Catholic Primary School, hard and soft landscaping, new playing field and new hard surfaced sports courts, relocated catering pods together with associated substation, LV switch room, ground source heat pump enclosure, water tank, bin store and relocation of storage containers

    Awaiting decision Full applications Demolition 130 docs
  • 14 Demage Lane Upton Chester CH2 1EL

    26/00361/FUL Submitted 3 Feb 2026 Cheshire West and Chester

    Alterations to existing front garden to change to driveway to include dropped kerb and electric vehicle charging point

    Granted Full applications
  • Gowy Marsh Waste Disposal Site Ince Lane Wimbolds Trafford Chester CH2 4JP

    25/03414/FUL Submitted 30 Oct 2025 Cheshire West and Chester

    92% historically approved · decision due ~16 Jan

    Construction and operation of a photovoltaic solar array and ancillary infrastructure.

    Awaiting decision Full applications 109 docs

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 46 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode