Electricians · CH2
5 potential projects within 5 miles of CH2.
From the planning register, over the last 90 days, matched to the work electricians do. Every one of these is a real application at a real address.
What kind of work it is
Over the last 90 days
| Kind of application | Near you |
|---|---|
| Full applications | 5 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Ellesmere Port Fire Station Wellington Road Ellesmere Port CH65 0EZ
92% historically approved · decision due ~23 Oct
Part demolition of existing Fire Station. Single storey extension, erection of substation, installation of solar panels, and alterations to remaining site including installation of security fencing,
Awaiting decision Full applications Extension DemolitionSmall domestic -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
92% historically approved · decision due ~23 Oct
Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure. The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities. In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital. 1. New Energy Generation Compound Construction of a new Energy Generation Compound housing: ? 2 No. 5MW high efficiency gas-fired LTHW boilers ? 1 No. 11m high chimney and associated flue arrangements ? Pressurisation systems ? Expansion plant ? Water treatment equipment ? Associated mechanical services ? Building management systems ? Electrical infrastructure 2. Distribution Infrastructure Construction of: ? New primary LTHW distribution network ? Interconnecting pipework systems 3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems) ? Creche ? Longhouse ? Martindale House ? Moston Lodge ? EDTC & Postgraduate 4. Substation Construction of a new Substation housing: ? Transformer ? LV Switchboard
Awaiting decision Full applications -
30 Hoole Road Chester CH2 3NJ
92% historically approved · decision due ~8 Sep
Single storey rear extension. Raised roof to side elevation, with solar panels and rooflight on rear elevation. Outbuilding roof pitch raised to create ancillary accommodation. Side extension to incorporate a ground floor WC from the entrance hall
Awaiting decision Full applications Extension Loft or dormer 14 docsSmall domestic -
39 White Friars Chester CH1 1NZ
92% historically approved · decision due ~1 Sep
Installation of roof-mounted solar photovoltaic panels to the rear roof slope and installation of an external battery and inverter unit to the rear elevation.
Awaiting decision Full applications 5 docs -
38 Lache Lane Chester CH4 7LR
92% historically approved · decision due ~21 Sep
Remodelling of existing dwelling to form a two-storey dwelling, including single-storey and first-floor extensions, alterations to the roof incorporating rooflights and solar panels, changes to external materials including cladding and render
Awaiting decision Full applications Extension Loft or dormer 5 docsSmall domestic
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.