Plumbers · CB25
3 potential projects within 5 miles of CB25.
From the planning register, over the last 12 months, matched to the work plumbers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 3 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Waterbeach Barracks Proposed Development Site Denny End Road Waterbeach Cambridgeshire
Full planning approval is sought for: Highways improvement works comprising the realignment of the A10 including carriageway realignment and the construction of a roundabout junction providing access to the Waterbeach Barracks and Airfield site and a spur in a location suitable for the future construction of a road link serving the Travel Hub Waterbeach and Cambridge Guided Busway and all necessary infrastructure works including: the construction of necessary surface water drainage infrastructure, utilities infrastructure, lighting, engineering and land remodelling works, hard and soft landscaping works, tree and hedgerow planting, habitat creation and ecological mitigation measures, all necessary enabling works including tree, hedgerow and vegetation removal, construction site access and works to provide a construction compound, all necessary demolitions, and the relocation of the Grade II Listed Milestone half mile south of Green End junction and Goose Hall
Granted Full applications Trees 156 docs -
Fernleigh Farm Teversham Road Fulbourn Cambridgeshire CB1 9AN
88% historically approved · decision due ~25 May
Erection of stable block, hay barn, horse walker and lunge pen, parking, drainage works and landscaping.
Awaiting decision Full applications 33 docs -
Phase 6 Millstone Park Newmarket Road Burwell CB25 0BA
93% historically approved · decision due ~20 Jan
Residential development of land at Millstone Park, Burwell (Phase 6) to provide 60 dwellings with associated landscaping, access, drainage and related infrastructure
Awaiting decision Full applications New dwelling 173 docsMajor scheme
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.