Skip to content
PlanIndex Get alerts
Menu

Landscapers · BT23

8 potential projects within 5 miles of BT23.

From the planning register, over the last 90 days, matched to the work landscapers do. Every one of these is a real application at a real address.

8 Applications near you Within 5 miles of BT23, over the last 90 days
0 Already approved Permission granted. Most have nobody booked yet.
1 Kinds of work Matched to what a landscaper does

What kind of work it is

Over the last 90 days

Kind of applicationNear you
Conditions 8

A few of them

Approvals first, because an approval is a budget looking for a builder

  • Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards

    LA06/2026/0729/DC Submitted 8 Aug 2026 Ards and North Down

    96% historically approved · decision due ~3 Oct

    Discharge of Condition 24 of previously approved application LA06/2021/1476/F which states - No development activity, including ground preparation or vegetation clearance, shall take place until a Badger Mitigation Plan (BMP) has been submitted to and approved in writing by the Council. The approved BMP shall be implemented in accordance with the approved details, and all works on site shall conform to the approved BMP, unless otherwise approved in writing by the Council. As a minimum the BMP shall include the following: a) Details of updated surveys for badgers; b) Provision of 25m buffers between all development activity and all retained badger setts; c) Details of wildlife corridors to allow movement of badgers to and from setts and/or foraging areas; d) Details of appropriate fencing to protect badgers and their setts/wildlife corridors; e) Details of appropriate measures to protect badgers from harm during the construction phase; f) Details of the appointment of a competent ecologist to oversee the implementation of badger mitigation measures during the construction phase, including their roles, responsibilities and timing of visits. A Badger Mitigation Plan (BMP)

    Awaiting decision Conditions 3 docs
  • Lands to the rear of 23-61 Castle Street, Comber, BT23 5EA

    LA06/2026/0523/DC Submitted 11 Jun 2026 Ards and North Down

    Discharge of Condition 6 of previously approved application LA06/2021/1220/F which states - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate that the remediation measures outlined in the Pentland Macdonald report; Contamination Assessment and remediation strategy, Castle Lane, Comber referenced PM19- 1137 and dated December 20219 have been implemented. The Verification Report shall demonstrate the successful completion of remediation works and that the site is now fit for end-use (Residential with Plant Uptake). It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current guidance and best practice. In particular, this Verification Report must demonstrate that: • The final site layout including areas of hardstandlng, gardens and soft landscaped areas are as specified in the Site Plan Proposed Drawing No. 03A. • The emplacement of capping layers across gardens and landscaped areas is as specified: In garden areas- 1m capping layer comprising a capillary break layer of a minimum of 300mm of granular material; overlain by 700mm of clean subsoil and topsoil and in soft landscaped areas- the emplacement of a 0.5m thick capping layer of glean gravel/ subsoil topsoil. All material used in the capping layers must be demonstrably proven suitable for use. • Gas protection measures have been installed in line with a Characteristic Situation 2 scenario which attain a gas protection score of 3.5 (Table 4, B88485) and shall include two or more of the following measures: • Concrete floor slabs; • A proprietary gas resistant membrane installed across the entire footprint of the buildings; • A passively ventilated under floor void. The verification of the gas protection measures shall follow CIRIA C735 Good Practice on the testing and verification of protection systems for buildings against hazardous ground gases. Information Submitted: Verification Report

    Decided Conditions 7 docs
  • Phase 3, Rivenwood Boulevard, Newtownards

    LA06/2026/0650/DC Submitted 16 Jul 2026 Ards and North Down

    96% historically approved · decision due ~10 Sep

    Discharge of condition 2 of approvalLA06/2025/0566/F: All hard and soft landscape works shall be carried out in accordance with details shown on Drawing No.06C of LA06/2021/0061/F; the approved planting plans Drawings No.28B of LA06/2021/0061/F and No.29B of A06/2021/0061/F, and the approved planting schedule (except in so far as they relate to the proposed SuDS Pond which shall be carried out in accordance with details to be subsequently approved under condition no. 17) and the appropriate British Standard or other recognised Codes of Practice. Prior to the occupation of any dwelling details of the proposed phased implementation of all hard and soft landscaping works must be submitted to and agreed in writing by the Council. The hard and soft landscaping works shall be implemented in accordance with the details and timings agreed in the approved phasing plan. All hard landscape works shall be permanently retained in accordance with the approved details. Reason: To ensure the provision, establishment and maintenance of a high standard of landscape.

    Awaiting decision Conditions 3 docs
    Domestic
  • Phase 3, Rivenwood Boulevard, Newtownards

    LA06/2026/0648/DC Submitted 16 Jul 2026 Ards and North Down

    96% historically approved · decision due ~10 Sep

    Discharge of condition 5 of LA06/2025/0566/F: A final landscape and play park management and maintenance plan for the development, including long term design objectives, performance indicators, management responsibilities and maintenance schedules for all landscaped areas including the play park, other than small, privately owned domestic gardens, (except for trees or other vegetation retained in the public interest) shall be submitted to and approved by the Council in writing prior to the commencement of development. The landscape and play park management plan shall be carried out as approved in perpetuity. Reason: To ensure the provision and maintenance of public open space within the site.

    Awaiting decision Conditions Trees 3 docs
  • Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA

    LA06/2026/0516/DC Submitted 11 Jun 2026 Ards and North Down

    Discharge of Condition 12 of previously approved application LA06/2021/1220/F which states:- No residential units shall be occupied until a Landscape Management and Maintenance Plan has been submitted to and approved by the Council in writing. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules for all areas of landscaping and open space. The landscape management plan shall be carried out as approved in perpetuity. Landscape Management & Maintenance Plan Condition and Discharge of Condition 13. which states:- The long term management and maintenance of the open space, as indicated in blue on Drawing No. 19 shall be undertaken by a management company commissioned by the developer. Details of the arrangements to be put in place to establish the management company and details of the alternative measures which will take effect in the event that the management arrangements break down, must be submitted to and agreed in writing with the Council prior to the occupation of any part of the development hereby permitted Radius Housing letter

    Decided Conditions 7 docs
  • Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards

    LA06/2026/0512/DC Submitted 10 Jun 2026 Ards and North Down

    Discharge of Condition 20 of previously approved application LA06/2021/1476/F which states:- Prior to the occupation of any dwelling, details of the proposed phased implementation of hard and soft landscaping works must be submitted to and agreed in writing by the Council. The hard and soft landscaping works shall be implemented in accordance with the details and timings agreed in the approved phasing plan. Phase plan to show when we plan to have landscaped areas completed

    Decided Conditions 6 docs
    Domestic

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode