Planning agent

Trident Engineering Consultants

An engineering consultancy registered in Paisley. 8 planning applications on PlanIndex across 5 councils . On the register from 2018 to 2026.

Where they work

What they file

  1. Conditions50%
  2. Advertising13%
  3. Amendments13%
  4. Full applications13%
  5. Prior approval13%

Company record

From Companies House. Company information only; we never show personal contact details.

Registered name
TRIDENT ENGINEERING CONSULTANTS LIMITED
Company number
SC145230
Status
Active
Incorporated
30 June 1993
Registered in
Paisley

Track record

The 8 most recent applications naming this firm

  • DC/26/1300/DRC Awaiting decision

    Haven Filling Station Dock Road The Docks Felixstowe Suffolk IP11 3SH

    Discharge of Condition Nos. 4 and 10 of DC/23/2349/FUL - Two double skinned fuel tanks will be installed on the existing site for the offloading and loading of fuels. These tanks will be installed on new reinforced concrete slabs. An electrical GRP pre-fabricated unit will be installed for the electrical connections. A catchment area around the two tanks will be surrounded by drainage channels to capture any spills and runoff from the loading of trucks. These channels will lead to sumps which will be connected to a full class 1 interceptor. Existing underground tanks to be foam filled. - OHES Level 4 Assessment and OHES Supplementary Environmental Assessment

    Submitted 7 Apr 2026 Conditions
  • DC/26/1299/VOC Awaiting decision

    Haven Filling Station Dock Road The Docks Felixstowe Suffolk IP11 3SH

    Variation of Condition Nos. 2, 4 & 6 of DC/23/2349/FUL - Two double skinned fuel tanks will be installed on the existing site for the offloading and loading of fuels. These tanks will be installed on new reinforced concrete slabs. An electrical GRP pre-fabricated unit will be installed for the electrical connections. A catchment area around the two tanks will be surrounded by drainage channels to capture any spills and runoff from the loading of trucks. These channels will lead to sumps which will be connected to a full class 1 interceptor. Existing underground tanks to be foam filled. - Condition 02 - change to allow for minor site layout amendments: -Installation of an additional six-hose dispenser and associated small island linked to Tank 1, including leak-detected underground pipework, to improve traffic flow and reduce standing vehicles. - Replacement of the full concrete yard within the Certas boundary with Hardicrete. - Minor layout adjustments, including relocation of lighting columns and slight positional refinements to suit the revised arrangement. - Increase width of site entrance. Condition 04 and Condition 06 - Change wording: As per discussion with planning officer and environment agency consultation (Letter ref. DC/23/4835/DRC) due to nature of required information for referenced conditions, it was advised that the correct procedure would be the submission of a variation of condition application (to allow of submittal of required information during construction / prior site occupation) where any subsequent conditions can also be amended to reflect the required action/works being undertaken in order to effectively discharge this condition.

    Submitted 7 Apr 2026 Amendments
  • DC/26/0888/ADI Awaiting decision

    Haven Filling Station Dock Road The Docks Felixstowe Suffolk IP11 3SE

    Illuminated Advertisement Consent - The installation of totem pole sign 6.5m x 1.8m with associated foundation.

    Submitted 5 Mar 2026 Advertising
  • DC/23/4835/DRC Granted

    Haven Filling Station Dock Road The Docks Felixstowe Suffolk IP11 3SE

    Discharge of Conditions 3, 4 & 10 of DC/23/2349/FUL - Two double skinned fuel tanks will be installed on the existing site for the offloading and loading of fuels. These tanks will be installed on new reinforced concrete slabs. An electrical GRP pre-fabricated unit will be installed for the electrical connections. A catchment area around the two tanks will be surrounded by drainage channels to capture any spills and runoff from the loading of trucks. These channels will lead to sumps which will be connected to a full class 1 interceptor. Existing underground tanks to be foam filled. - Oil Spill Incident Response Plan, Site Redevelopment Phasing Letter & Pilling Risk Assessment Submitted.

    Decided 18 Sep 2024 Conditions
  • 20/00393/DISCON Decided

    Doe Hill Depot Doe Hill Lane Tibshelf Alfreton DE55 6JS

    Discharge of Condition 6 (Noise Management Plan) of Planning Permission 19/00142/FUL

    Decided 12 Nov 2020 Conditions
  • AOD/19/00320 Granted

    Certas Energy UK Ltd Shell Direct 3 Derwent Valley Industrial Estate Dunnington York YO19 5PD

    Condition 3 of permitted application 19/01015/FUL

    Decided 27 Sep 2019 Conditions
  • 19/00213/FULL Withdrawn

    Littlefair Road HGV Bunkering Facility Kingston Upon Hull HU9 5LP

    Installation of a double-skinned rectangular steel HGV fuel storage tank with dispensers

    Decided 8 Dec 2020 Full applications
  • DEM/2018/0002 Decided

    Unit 7 Javel Industrial Estate Three Cocks Brecon LD3 0SL

    DEM: Demolition notification: removal of modular office building. Demolition of 7 horizontal steel fuel storage tanks and brick supports. Removal of all above ground pipework and valves, etc. Demolition of steel canopy structure and associated walkways. Removal of all steel walkways. Breaking out and removal of all associated concrete plinths.

    Decided 11 May 2018 Prior approval

The full track record

Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.

See the full track record

From council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.