Skip to content
PlanIndex Get alerts
Menu

Planning agent

RAFT CIC

5 planning applications on PlanIndex. On the register from 2025 to 2026.

Where they work

What they file

  1. Full applications60%
  2. Amendments20%
  3. Heritage and listed buildings20%

Track record

The 5 most recent applications naming this firm

  • PA/26/00463/S Granted

    Cubitt Town Junior And Infants Primary School, Glengall Grove, London, E14 3NE

    Application for Non-Material amendment to planning permission ref: PA/25/01777, Dated 10/12/2025. Non Material amendment(s) Sought: Omission of the acoustic louvre screen enclosing the ASHPs and buffer tank proposed to Roof 2 on the south-west elevation, and replace with edge-protection guardrails.

    Decided 19 May 2026 Amendments
  • PA/25/02018/NC Granted

    Bonner Mile End Primary School Building 1, 2C Ropery Street, London, E3 4QE

    The proposed works include: Installation of air-source heat pumps (ASHPs) to Block A; Replacement and upgrading of all existing cast iron radiators and pipework; Adaptation of the storage outbuilding (Block D) to accommodate a new substation to cope with increased electrical demand as a result of decarbonising the heating infrastructure; Enhancement of the school play area; Replacement of all existing single-glazed windows with new heritage-style timber frame, double glazing windows; Replacement of all external timber doors in the same style as existing; Adding further loft insulation to the existing loft space to Block A.

    Decided 13 Aug 2026 Heritage and listed buildings
  • PA/25/02017/NC Granted

    Bonner Mile End Primary School Building 1, 2C Ropery Street, London, E3 4QE

    The proposed works include: Installation of air-source heat pumps (ASHPs) to Block A; Replacement and upgrading of all existing cast iron radiators and pipework; Adaptation of the storage outbuilding (Block D) to accommodate a new substation to cope with increased electrical demand as a result of decarbonising the heating infrastructure; Enhancement of the school play area; Replacement of all existing single-glazed windows with new heritage-style timber frame, double glazing windows; Replacement of all external timber doors in the same style as existing; Adding further loft insulation to the existing loft space to Block A.

    Decided 13 Aug 2026 Full applications
  • PA/25/01777/NC Granted

    Cubitt Town Junior And Infants Primary School, Glengall Grove, London, E14 3NE

    Proposed works at Cubitt Town School comprise the installation of new Air Source Heat Pumps (ASHPs) to replace the existing gas-fired heating and hot water systems. The upgrade will deliver a low -carbon solution in line the borough's sustainability objectives. Additionally a photovotaic (PV) panel array with a capacity of up to 100kWp will be installed, supporting onsite renewable energy generation.

    Decided 10 Dec 2025 Full applications
  • PA/25/01778/NC Granted

    Bangabandhu Primary School, 28 Wessex Street, London, E2 0LB

    Installation of Air Source Heat Pumps with associated equipment and perimeter visual screens, installation of photovoltaic panels with a capacity of up to 100kWp and replacement metal gates to service yard.

    Decided 2 Dec 2025 Full applications

The full track record

Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.

See the full track record

From council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.