Planning agent
Green Cat Renewables Ltd
Registered in Roslin. 27 planning applications on PlanIndex across 15 councils . Agent on 26 and applicant on 1. On the register from 2011 to 2026.
- 27 Applications on record
- 12 In the last 12 months
- 15 Councils
- 82% Granted of 11 decided
9 granted and 2 refused of 11 decided applications in our index. A record of decisions already made, not a forecast of the next one.
Where they work
-
-
-
-
-
Fife2
-
-
-
-
-
-
-
And 3 other councils.
What they file
-
Full applications61%
-
Conditions22%
-
Outline17%
Company record
From Companies House. Company information only; we never show personal contact details.
- Registered name
- GREEN CAT RENEWABLES LIMITED
- Company number
- SC277156
- Status
- Active
- Incorporated
- 7 December 2004
- Registered in
- Roslin
Track record
The 10 most recent applications naming this firm
-
26/1457/S42 Awaiting decision
Plascow Farm Kirkgunzeon Dumfries DG2 8JT
INSTALLATION OF GROUND MOUNTED SOLAR ARRAY (500KW) TO FORM EXTENSION TO EXISTING SOLAR ARRAY AND ASSOCIATED WORKS WITHOUT COMPLIANCE WITH CONDITION 1 OF PLANNING PERMISSION 23/2276/FUL (SECTION 42)
-
26/209/VR Awaiting decision
Burgar Hill Wind Farm, Evie, Orkney
Application to vary Condition 2 of 21/512/VR (varying 02/16/00189/PPF) to extend the operational life of two turbines at Burgar Hill from 20 years to 25 years from date of commissioning
-
0468/FUL/26 Awaiting decision
Pearie Law West Calder West Lothian EH55 8LT
Application under Section 42 for same development as planning permission 0124/FUL/21 (Erection of 3 wind turbines with maximum height to blade tip of 180m and 1 wind turbine with maximum height to blade tip of 150m and associated infrastructure (EIA Development) (as varied from 4 turbines all 180m)) without compliance with condition 2 (duration of permission) to extend the operational life of the consented Pearie Law II Wind Farm from 30 years to 40 years from the first export date
-
26/01585/FULL Awaiting decision
Land East Of Lochtyside Cottages Blackwood Road Glenrothes Kirkcaldy Fife KY1 4DE
Development of ground mounted solar array including erection of substation building, landscaping and associated infrastructure works
-
26/148/TPPMAJ Awaiting decision
Burgar Hill Wind Farm, Evie, Orkney
Replace five existing turbines (up to 116m to tip, 11.3MW) with 5 wind turbines (up to 149.9m to tip, up to 30MW export) with associated auxiliary infrastructure
-
26/0843/S36 Awaiting decision
Proposed High Mark Wind Farm Site Approximately 5km To The North East Of Cairnryan Stranraer
CONSULTATION FROM SCOTTISH GOVERNMENT REGARDING AN APPLICATION MADE UNDER SECTION 36 OF THE ELECTRICITY ACT 1989 FOR A WIND FARM COMPRISING THE ERECTION OF 7 WIND TURBINES (MAXIMUM HEIGHT TO BLADE TIP 200 METRES), INSTALLATION OF BATTERY ENERGY STORAGE SYSTEM AND ASSOCIATED INFRASTRUCTURE FOR AN OPERATIONAL PERIOD OF 40 YEARS
-
26/01985/DVCON Granted
The Outside Inn Skipton Road Kettlesing North Yorkshire HG3 2LT
Section 73 application for the Variation of Condition 4 (increase time limit to 12 months for removal of equipment) of planning permission HGT12/01564/FUL (Erection of wind turbine on 24m high monopole mast.) To allow longer timescale noted within condition to ensure issue can be resolved safely.
-
26/01985/DVCON Granted
The Outside Inn Skipton Road Kettlesing North Yorkshire HG3 2LT
Section 73 application for the Variation of Condition 4 (increase time limit to 12 months for removal of equipment) of planning permission HGT12/01564/FUL (Erection of wind turbine on 24m high monopole mast.) To allow longer timescale noted within condition to ensure issue can be resolved safely.
-
26/01985/DVCON Granted
The Outside Inn Skipton Road Kettlesing North Yorkshire HG3 2LT
Section 73 application for the Variation of Condition 4 (increase time limit to 12 months for removal of equipment) of planning permission HGT12/01564/FUL (Erection of wind turbine on 24m high monopole mast.) To allow longer timescale noted within condition to ensure issue can be resolved safely.
-
26/0072/FUL Awaiting decision
Land To The South Of The Former Chapelcross Nuclear Power Station Near Annan
CONSTRUCTION AND OPERATION OF A GREEN HYDROGEN PRODUCTION FACILITY INCLUDING INSTALLATION OF ELECTROLYSER FACILITY, COMPRESSOR, GENERATOR AREAS, HYDROGEN STORAGE AND DRYING AREAS, WATER TREATMENT AREA, SUDS PONDS AND DRAINAGE, PARKING, HARDSTANDING AND ACCESS, TUBE TRAILER FILLING POINTS, SITE OFFICES, CONTROL ROOMS, WELFARE AREAS, LABS, STORES AND ASSOCIATED INFRASTRUCTURE
17 more applications on record
Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.
See the full track recordFrom council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.