An architecture practice. 22 planning applications on PlanIndex across 4 councils . On the register from 2010 to 2022.

19 granted and 1 refused of 20 decided applications in our index. A record of decisions already made, not a forecast of the next one.

Where they work

What they file

  1. Conditions73%
  2. Full applications27%

Track record

The 10 most recent applications naming this firm

  • 22/04114/DET Granted

    22 Wyvil Road London SW8 2TG

    Approval of details pursuant to condition 23(Cycle Parking) of planning permission 17/02874/FUL (Demolition of the existing buildings and erection of 9 storeys building with basement level comprising commercial use (Use Class B1) at basement and ground floors and 30 residential units (Use Class C3) on the upper levels, together with landscaping and public realm, communal terrace at roof level, ancillary servicing and plant, 47 cycle parking spaces and associated work) granted on 20.02.2020.

    Decided 3 Jan 2023 Conditions
  • 22/AP/3091 Granted

    150-154 Borough High Street London Southwark SE1

    RESUB- Detail of Condition 3-Tree survey - proposed works/protection as required by full planning permission ref 19/AP/1173 dated 21/03/2022 for minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of thewhole site.) Changes include:- Construction of a single storey extension at ground floor level to the rear;- New wall at ground floor level to the west and north elevation;- Raised cil level at 6th floor;- Fenestration changes, including additional windows to the east elevation at ground floor level;- Changes to the tower design, removal of glazed corner cube;- Revised plant configuration at roof level;- New staircore, lift overrun and smoke extract at roof level;- Areas at roof reserved for photovoltaics and green roof;- Creation of a new basement level to accommodate a new sprinkler tank/plant.Condition 3 Arboriculture 22/AP/1008 Oliver Stutter The condition is being re-submitted purely so that it can be discharged under the new S73 reference 21/AP/0960

    Decided 16 Nov 2022 Conditions
  • 22/AP/1487 Decided

    2 Varcoe Road London Southwark SE16 3DG

    Non material amendment required by planning permission 18/AP/2895 Demolition of existing buildings and erection of a new mixed use development comprising a part 7, part 9 storey (maximum height above ground of 29.99m) building of 288sqm commercial floor space (Use Class B1) and 74 residential dwellings (Use Class C3) with associated bin stores, cycle stores, plant rooms and hard and soft landscaping.This application represents a departure from strategic policy 10 'Jobs and Businesses' of the Core Strategy (2011) and Saved Policy 1.2 'Strategic and Local Preferred Industrial Locations' of the Southwark Plan (2007) by virtue of proposing to introduce residential accommodation in a preferred industrial location.1. Increased height of lift overrun to North Core 2. Increased height of lift overrun to South Core 3. Create 1.8m high fence/guarding to perimeter of kids playground. 4.Alterations to 2nd floor enclosed balconies on west elevation (only) to be openable winter gardens to match original approved design. 5.Alterations to 3rd floor and above enclosed balconies on west elevation (only) to be open balconies with railing and balustrade to match original approved design.

    Decided 7 Dec 2022 Conditions
  • 22/AP/1476 Granted

    150-154 Borough High Street London Southwark

    Details of condition 20 (Fire statement) required by planning permission 21/AP/0960 Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.

    Decided 17 Jun 2022 Conditions
  • 22/AP/1467 Granted

    150-154 Borough High Street London Southwark

    Details of condition 6 (Archaeological Mitigation Works) required by planning permission 21/AP/0960 Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.

    Decided 12 Jul 2022 Conditions
  • 22/AP/1474 Granted

    150-154 Borough High Street London Southwark

    Details of condition 15 (Materials)) required by planning permission 21/AP/0960 Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include:- Construction of a single storey extension at ground floor level to the rear;- New wall at ground floor level to the west and north elevation;- Raised cil level at 6th floor;- Fenestration changes, including additional windows to the east elevation at ground floor level;- Changes to the tower design, removal of glazed corner cube;- Revised plant configuration at roof level;- New staircore, lift overrun and smoke extract at roof level;- Areas at roof reserved for photovoltaics and green roof;- Creation of a new basement level to accommodate a new sprinkler tank/plant.

    Decided 6 Sep 2022 Conditions
  • 22/AP/1008 Granted

    150-154 Borough High Street London Southwark

    Details of Condition 3 Arboricultural Method Statement as required by planning permission 19/AP/1173 dated 11/3/2021 for construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) onthe ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.

    Decided 6 Jun 2022 Conditions
  • 22/AP/0852 Granted

    150-154 Borough High Street London Southwark

    Details of condition 5a & 5b (Land Contamination) required by planning permission 21/AP/0960 Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.

    Decided 13 Jul 2022 Conditions
  • 22/AP/0854 Granted

    150-154 Borough High Street London Southwark

    Details of condition 7 Archaeological Foundation Design as required by planning permission 21/AP/0960 dated 21/03/2022 for construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) onthe ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.

    Decided 23 May 2022 Conditions
  • 22/AP/0855 Granted

    150-154 Borough High Street London Southwark

    Details of condition 10 ARCHAEOLOGICAL EVALUATION as required by planning permission 19/AP/1173 dated 5/6/2020 for construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.

    Decided 12 Jul 2022 Conditions

12 more applications on record

Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.

See the full track record

From council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.