Planning agent
Doran Consulting
Registered in Belfast. 5 planning applications on PlanIndex across 2 councils . On the register from 2025 to 2026.
- 5 Applications on record
- 5 In the last 12 months
- 2 Councils
- Too few Decisions to give a rate
Where they work
What they file
-
Heritage and listed buildings60%
-
Conditions20%
-
Full applications20%
Company record
From Companies House. Company information only; we never show personal contact details.
- Registered name
- DORAN CONSULTING LIMITED
- Company number
- NI055181
- Status
- Active
- Incorporated
- 13 May 2005
- Registered in
- Belfast
Track record
The 5 most recent applications naming this firm
-
LA10/2026/0070/LBC Granted
Between 187 & 189 Wattlebridge Road Newtownbutler
New canal cut taken adjacent to existing Wattlebridge, on the South-East side of the existing bridge. New arch to be added approximately 20m to the east of the existing bridge. The existing bridge to remain unaltered. Some walls extending beyond the parapet to be taken down and rebuilt.
-
LA02/2025/0894/DC Awaiting decision
Lands opposite 382 Old Glenarm Road, Larne, BT43 5EJ
Discharge of Planning condition 2 from application LA02/2021/0770/F. The drainage assessment and flood risk assessment for the planning authority's consideration.
-
LA02/2025/0811/LBC Granted
Carrickfergus Harbour
Slipways: Repointing to stone masonry walls. King William Pier (grade B1 listed) KWP is in poor structural condition and require remedial works to ensure its stability. . There are two main distinguishabe forms of construction: - 'square' masonry blocks sections, with old pointing washed out: Record information indicates that part of this pier was taken down and rebuilt in 1990 due to its poor condition, and underpinning carried out. Due to funding issues, the repairs were undertaken only at discrete locations and the remaining unrepaired areas continued to deteriorate. A similar underpin/concrete skirt is proposed throughout the pier, with top level maximum 450mm below mid tide level. Repointing throughout is proposed. - round head: The bottom layer consists of unbound round loose stones that have moved over time, causing the structure to lose its integral form. It is proposed to underpin the bottom layer of stones with a concrete skirt. The top level of the skirt will be below mid-tide level. The head is believed to be founded on boulder clay, different that the remaining of the harbour founded in marl. Floor stones to be lifted and reset. Modern harbour, part of KWP setting: Albert Edward Pier There is a short section with large sandstones that are eroded and large voids noted. Some of the coping stones are loose as the underlaying sandstone eroded. Coping stones to be lifted and reset over a steel plate to bridge the gaps while leaving the eroded sandstone in place. Repointing to the back of sandstone blocks. The concrete outer parapet wall is in very poor condition with large cracks and voids noted. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls. North Wall Apply sealant to joints Alexandra Pier The outer parapet wall is in very poor condition with large cracks and voids noted. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls.
-
LA02/2025/0806/DCA Granted
Adjacent to Albert Edward Pier (on the seaward side, behind the parapet).
Demolition of derelict piles from the old boatclub.
-
LA02/2025/0843/F Granted
Carrickfergus Harbour
Works to slipways, involving repointing to stone masonry walls. Works to King William Pier including underpin/concrete skirt and repointing throughoutproposed. Works to Albert Edward Pier involve the coping stones to be lifted and reset over a steel plate to bridge the gaps while leaving the eroded sandstone in place. Repointing to the back of sandstone blocks. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls. Works to the North Wall involve applying sealant to joints Works to Alexandra Pier include a new RC skin and anodes are to be installed to the sheet pile walls.
The full track record
Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.
See the full track recordFrom council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.