Planning agent
Construction Design Studio
A design practice registered in Ashford. 5 planning applications on PlanIndex across 2 councils . On the register from 2023 to 2025.
- 5 Applications on record
- 0 In the last 12 months
- 2 Councils
- Too few Decisions to give a rate
Company record
From Companies House. Company information only; we never show personal contact details.
- Registered name
- CONSTRUCTION DESIGN STUDIO LIMITED
- Company number
- 09428666
- Status
- Active
- Incorporated
- 9 February 2015
- Registered in
- Ashford
Track record
The 5 most recent applications naming this firm
-
25/2794/HD Granted
139 CONGREVE ROAD, ELTHAM, LONDON, SE9 1LL
Construction of a single storey rear extension and refurbishment of garden room with associated works.
-
23/03719/AMD Refused
20 Lulworth Road, Mottingham, London, SE9 4DL
Amendment to planning permission ref 23/03719/FULL6:Removal of the proposed set back on the first floor front elevation.
-
24/3191/PN1 Granted
72 CAMDALE ROAD, PLUMSTEAD, LONDON, SE18 2DS
Prior Approval for the construction of a single storey rear extension which will extend beyond the rear wall of the original dwelling by 4.50m, for which the maximum height will be 3.75m and the height at the eaves will be 2.95m.
-
24/2251/PN1 Refused
72 CAMDALE ROAD, PLUMSTEAD, LONDON, SE18 2DS
Prior Approval for the construction of a single storey rear extension which will extend beyond the rear wall of the original dwelling by 4.50m, for which the maximum height will be 3.45m and the height at the eaves will be 2.75m.
-
23/00320/FULL6 Refused
9 Spinney Way, Cudham, Sevenoaks, TN14 7QY
Demolition of existing conservatory and construction of two storey rear extension with Juliet balcony. Extension of existing dormers and extension of existing raised decking area
The full track record
Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.
See the full track recordFrom council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.