Planning application
Courtrai 14 Evesham Road Reigate Surrey RH2 9DF
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
T1 Holly rear garden RHS Reduce height by 1.5 metres and trim to shape 3.5x4m down to 2x2m To allow light in to the rear of property . T2 Holly, Laurel & Yew group rear garden RHS Reduce height by 1 metre and trim to shape 3.5x5m down to 2.5x4m To allow light in to the rear of property. T6 Yucca/Cordyline rear garden Fell to ground level 4.5x2m Outgrown position
As published by the council, reference 22/00319/CAN
Application record
- Reference
- 22/00319/CAN
- Type
- Conservation Area Notice
- Status
- Decided (Approved)
- Decision
- Granted As published: Approved
- Received
- 14 Feb 2022
- Validated
- 14 Feb 2022
- Decided
- 10 Mar 2022
- Ward
- Reigate
- Decision by
- Senior Planning Officer
- Postcode
- RH2 9DF
Site history
Applications at this address on the Reigate and Banstead register
This site has had 2 applications since 2022: 2 approved, 0 refused.
-
26/00033/CAN Granted
Courtrai 14 Evesham Road Reigate Surrey RH2 9DF
Copper Beech in front corner of garden (Corner of Evesham Road with Beaufort Close) - Reduce lateral branches in lower crown system up to 8m in height by approximately 1.5 to 2m ensuring a minimum clearance from the house of 3m and crown lift over the road to 5.5m and 3m over footpath.
Timeline
Dates from the published record
-
14 Feb 2022
Received by Reigate and Banstead
-
10 Mar 2022
Decision issued: Approved
-
25 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Reigate and Banstead granted permission on 10 March 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Priory Veterinary Surgery 10 Evesham Road Reigate Surrey RH2 9DF
Proposed demolition and replacement of current extension and store with new single-storey ground floor extension to the rear of the property. Variation of condition 1 of permission 24/00834/F. Relocation of proposed external doors to the rear of the extension, and subsequent changes to windows
Granted Amendments Extension Demolition +1 10 docsSmall domestic -
Read House 8A Evesham Road Reigate Surrey RH2 9DF
Loft conversion including the raising of a section of flat roof to the rear of the house and the introduction of rooflights and solar panels. As amended on 13/01/2021
Granted Householder Loft or dormer 19 docsDomestic -
Courtrai 14 Evesham Road Reigate Surrey RH2 9DF
Copper Beech in front corner of garden (Corner of Evesham Road with Beaufort Close) - Reduce lateral branches in lower crown system up to 8m in height by approximately 1.5 to 2m ensuring a minimum clearance from the house of 3m and crown lift over the road to 5.5m and 3m over footpath.
Granted Heritage and listed buildings Trees 5 docs -
31 Beaufort Road Reigate Surrey RH2 9DQ
Dormer loft conversion from hipped roof to gable, internal reconfiguration works and external alterations including timber overcladding to the rear of the property and external works to the garden. Variation of conditions 1 and 3 of permission 20/02673/HHOLD. Proposed change of materials to tiles to the east side elevation. As amended on 11/08/2022
Granted Amendments Loft or dormer 10 docs -
31 Beaufort Road Reigate Surrey RH2 9DQ
Non-material amendment. Alterations to ground floor rear glazing and first floor windows to the side and rear of the house. Alterations to positioning of rooflights to the front of the roof and windows on the dormer. Internal alterations.
Granted Amendments Loft or dormer Windows or glazing 16 docs -
1 Evesham Road Reigate Surrey RH2 9DF
Single storey rear and part side extension, alterations to the front garden/pavement boundary wall, changing the garage doors into casement windows, associated alterations to the north facing flank elevation and landscaping to the rear garden. As amended on 05/09/2022, 12/09/2022 and on 05/10/2022.
Granted Householder Extension Windows or glazing 26 docsSmall domestic
Other heritage and listed building applications
In Reigate and Banstead
-
26/01454/LBC Awaiting decision
The Bell Public House Withybed Corner Walton On The Hill Surrey KT20 7UJ
Internal alterations, replacement extension and demolition of timber smoking shelter.
-
26/01337/LBC Awaiting decision
Well House Inn Chipstead Lane Chipstead Surrey CR5 3SQ
Retrospective planning application for kitchen extension built over ten years ago. New landscaping and trellis to kitchen extension edge.
-
26/01358/CAN Awaiting decision
Hunters Lodge Reigate Hill Reigate Surrey RH2 9PL
T1 - removal of 1x fir tree down to ground level. G1 - removal of 2x fir trees down to ground level including uprooted stem leaning into the firs.
-
26/01196/CAN Awaiting decision
4 Beaufort Close Reigate Surrey RH2 9DG
1. Horse chestnut rear garden rear boundary. Carefully climb and dismantle to as close to ground level as possible. Remove most of wood, leave approx a dumpy bags worth of clean rings in a pile on driveway. - Details of work - Tree is dead 3. Lime rear RH corner back garden. Re-Pollard back to previous pollard points. Height pre 9m post 5m crown spread pre 8m post 5m - Details of work- re-pollarding as ongoing tree maintenance works
-
26/00899/CAN Granted
5 Yorke Road Reigate Surrey RH2 9HH
G1 Group of chestnut which overhanging 16 Hardwicke's rear garden boundary fence to be cut back to boundary fence and lifted up to 4m to allow for building works. Works only required on south side of trees overhanging 16 Hardwicke.