Planning application
Building On The Corner Of Oldham Road And The Gateway Newton Heath Manchester M40 5BJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of 32 AHU plant units, arranged over two floors, along with steel framed structure/screen to The Gateway, re-cladding of exterior of the building on the corner of Oldham Road and The Gateway and installation of 6 generators and 3 fuel tanks with associated 2.4 and 1.8 metre high boundary treatment to rear of the building (north east) along with relocation of existing plant to rear of building into an adjacent compound area
As published by the council, reference 108210/FO/2015/N1
Application record
- Reference
- 108210/FO/2015/N1
- Type
- Full Application Consent
- Status
- Permitted
- Decision
- Granted As published: Approved
- Received
- 13 Mar 2015
- Validated
- 13 Mar 2015
- Decided
- 22 Apr 2015
- Ward
- Miles Platting & Newton Heath Ward(2004)
- Decision by
- Delegated Decision
- Postcode
- M40 5BJ
Timeline
Dates from the published record
-
13 Mar 2015
Received by Manchester
-
22 Apr 2015
Decision issued: Approved
-
8 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Pozzoni LLP Agent, registered in Altrincham
Dissolved · incorporated 2007 · Altrincham
46 applications on PlanIndex · across 8 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 22 April 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Sharp Project Thorp Road Manchester M40 5BJ
Discharge of condition 4a (noise) attached to planning permission referenced 143112/FO/2025
Granted Conditions 2 docs -
The Sharp Project Thorp Road Manchester M40 5BJ
Discharge of Condition 4b (external plant) attached to attached to Planning Permission referenced 143112/FO/2025.
Granted Conditions 2 docs -
The Sharp Project Thorp Road Manchester M40 5BJ
Prior Approval for the installation of Solar Photovoltaics (PV) equipment on the roofs of nondomestic buildings.
Granted Prior approval 12 docs -
Sharp Electronics Uk Ltd Thorp Road Manchester M40 5BJ
Installation of an Air Source Heat Pump within existing external plant compound.
Granted Full applications 8 docs -
Central Park Northampton Road Manchester M40 5BP
Discharge of conditions 1 (time period), 2 (specified plans), 3 (landscaping) and 4 (road markings) attached to planning permission referenced 126684/FO/2020
Granted Conditions 4 docs -
Land Bounded By Oldham Road, Baltimore Street And The Gateway Manchester M40 5AU
Erection of a mixed use development comprising a 120-bedroom hotel (Use Class C1)( 7 storeys), office (Use Class B1)( 5 storeys), nursery (Use Class D1)( 2 storeys and basement), drive-through restaurant/retail unit (sui generis), and multi-storey car park( 6 storeys) , additional surface car parking, access, servicing, landscaping and associated infrastructure works, following the demolition of existing buildings and structures
Granted Full applications Demolition 59 docs
Other full applications
In Manchester
-
145536/VO/2026 Granted
Red Bank Neighbourhood Victoria North Manchester
City Council development for the installation of an enhanced temporary water treatment plant and associated works for a temporary period of three years.
-
PLA-2026-000518 Granted
62 Demesne Road Manchester M16 8PJ
Conversion of dwellinghouse (ground, first and second floors only) to form three 2-bed self-contained flats.
-
PLA-2026-000169 Granted
Unity Community Primary School 41 Allesley Drive Manchester M7 4YE
Erection of single storey classroom building for a temporary 5 year period.
-
PLA-2026-000887 Refused
478 Wilmslow Road Manchester M20 3BG
Change of Use of Flat 4 and part of Flat 1 from residential accommodation (Class C3) to restaurant floorspace associated with the existing restaurant (Class E(b)); reconfiguration and loft conversion to retained Flat 1; together with single-storey rear extension and associated elevational alterations.
-
PLA-2026-001241 Refused
331 Wilmslow Road Manchester M14 6NW
Installation of a new side extension to the existing hot food takeaway, comprising the infill of the recessed side area between the existing structural brick piers with full-height aluminium-framed glazing and a flat roof.