Council hub · Scotland
Highland planning applications
Page 70 of 115, newest first. The Highland hub carries the figures, decision times and common questions.
Applications
Page 70 of 115
-
24/02500/PNO Granted
Land 3.9KM East Of Sheneval Tomatin
Peatland restoration
-
24/02229/FUL Granted
Land 170M SW Of Balvatn House Watten
Erection of house and garage
-
24/02217/LBC Awaiting decision
Former Grain Store Elzy Road Staxigoe
Consolidation and extension of the existing Category B-listed remains of a granary to form a residential dwelling
-
24/02238/FUL Withdrawn
Rhiannon Highfield Park Conon Bridge Dingwall IV7 8AP
Erection of shed
-
24/02219/FUL Withdrawn
Land 35M SW Of 36 Seafield Place Aviemore
Demolition of stores, erection of 4no. flats
-
24/02231/FUL Granted
Land 55M SW Of Guisachan Cottage Tomich Cannich
Erection of house and garage
-
24/02234/FUL Granted
152 Oldshoremore Rhiconich Lairg IV27 4RS
Change of use from holiday accommodation to craft shop
-
24/02218/FUL Granted
Land 75M South Of 52 Aird Bernisdale Bernisdale Skeabost Bridge
Erection of dwelling
-
24/02498/PNO Granted
Land 2.4KM East Of Brin Lodge Flichity
peatland restoration
-
24/02211/PIP Awaiting decision
Land 215M NE Of Willowbank Lentran Inverness
Erection of house, garage and annex
-
24/02187/FUL Granted
Former Dingwall Baptist Church Tulloch Street Dingwall IV15 9JZ
Change of Use from Place of worship (Class 10) to Retail (Class 1a) and subdivision to form two units (amendment to 23/02796/FUL)
-
24/02186/FUL Granted
Land 120M NE Of Blaragie Farm Laggan
Erection of agricultural shed
-
24/02183/FUL Granted
Land 90M SW Of Morrison House Bayfield Road Portree Isle Of Skye
Installation of Kiosk
-
24/02214/FUL Granted
2 Hamilton Road Balmacara Kyle IV40 8DL
Alterations and extensions
-
24/02209/PIP Awaiting decision
Land 285M SE Of Willowbank Lentran Inverness
Erection of house, annex and garages
-
24/02160/FUL Withdrawn
Land 30M NE Of Tir-nan-og Quarry Glenelg
Installation of a 10.5 metre (agl) steel pole fitted with 2 x 0.6 metre dishes
-
24/02172/FUL Awaiting decision
The Co-operative Food 69 - 73 High Street Fortrose IV10 8TF
Alterations and extension
-
24/02174/FUL Granted
Gairloch WWTW Fasaich Strath Gairloch
Installation of mecana filter, chemical dosing kiosk and other ancillary equipment (retrospective)
-
24/02155/FUL Awaiting decision
Land 70M NE Of Dunbeag Strome Ferry
Erection of house with self-contained residential annex, garage with holiday letting unit above and siting of holiday letting hut
-
24/02153/FUL Awaiting decision
Land 1875M West Of Mamore Lodge Guest Accommodation Mamore Kinlochleven
Proposed installation of a 15m mast, 2No 0.3m dishes and ancillary development
-
24/02143/FUL Granted
Land 30M East Of Cruachan Reay
Erection of house
-
24/02144/FUL Granted
Old Schoolhouse Ardvasar Isle Of Skye IV45 8RS
Part change of use to form house including erection of extension
-
24/02141/FUL Granted
29 Wyvis Drive Nairn IV12 4TP
Erection of fencing
-
24/02133/FUL Granted
Land 525M SE Of Moyle Park Glenelg
Erection of house
-
24/02111/FUL Granted
Land East Of Medical Practice Torridon
Erection of house
-
24/02112/FUL Granted
Land 460M NE Of Fannich Lodge Lochluichart Garve
Installation of a 20m high lattice tower, ancillary equipment, compound, access track and associated development
-
24/02095/FUL Granted
Site 775M NW Of Rientraid Kylesku
Marine Fish Farm - Atlantic Salmon: New site consisting of 16 x 80m circumference circular cages plus 150t feed barge
-
24/02108/PIP Granted
Land 20M NW Of The Bungalow Toperfettle Grantown-On-Spey
Erection of house
-
24/02058/PIP Granted
Land 75M NW Of 11 Drumfield Road Drumfield Road Inverness
Erection of church, formation of access and associated groundworks
-
24/02061/FUL Awaiting decision
20 - 22 Mill Street Dingwall IV15 9PZ
Demolition of buildings and erection of 4no. flats (amended proposal 22/02175/FUL)
-
24/02047/FUL Granted
Land 225M SW Of The Schoolhouse Tanera Mhor Achiltibuie
Installation of Solar Array
-
24/02044/FUL Granted
Land 150M West Of Taigh Na Traon Linicro
Installation of pipe bridge
-
24/02030/S42 Awaiting decision
Former Fabrication Yard Ardersier
Ardersier Port - Application under Section 42 for non-compliance with Condition 10 (i) of Planning Permission 18/04552/PIP requiring the upgrade of the site access road junction with the A96 Trunk Road
-
24/02026/FUL Granted
Plot 3 Kinellan Green Strathpeffer
Erection of house and garage
-
24/02023/FUL Withdrawn
Land 140M NW Of Milton Of Kilravock Farm Cawdor
Erection of poultry unit
-
24/02007/FUL Granted
The Shack At Inchree Onich Fort William PH33 6SE
Siting of 2no short term let units and access (in retrospect)
-
24/02011/FUL Granted
Land 175M East Of Corran House Broadford Isle Of Skye
Erection of storage building within fenced compound
-
24/02012/FUL Granted
Land 45M NE Of Nurses Cottage Achiltibuie
Erection of house
-
24/02014/FUL Granted
Parkhead Croy Inverness IV2 7QS
Erection of grain intake building associated with existing grain dryer facility
-
24/01997/FUL Awaiting decision
Land 1110M SE Of Allt-Na-Reigh Glencoe
Installation of a 20m lattice mast, 3 no. SRN shared antennas, 3 no. transmission dishes, 5 no. ground-based equipment cabinets, 1 no. electricity generator and associated ancillary development within a 1.8m high weld mesh fence
-
24/02001/FUL Awaiting decision
Land 140M East Of Heights Of Achterneed Strathpeffer
Erection of house
-
24/01992/FUL Granted
53 Harbour Street Nairn IV12 4NX
Alteration and extension to house
-
24/02000/FUL Awaiting decision
Land 165M East Of Northern Lights Caravan Park Badcaul Dundonnell
Erection of house, formation of access, siting of 2no. cabins for holiday letting and erection of kayak shed and dock
-
24/02002/FUL Awaiting decision
Land 55M North Of Bruaich Mhor 5 Scullamus Breakish
Formation of cycle path from Broadford to Breakish (phase 3)
-
24/02003/FUL Withdrawn
Ashaig Breakish
Formation of cycle and pedestrian path between Skye Bridge and Broadford (phase 2)
-
24/01996/FUL Withdrawn
Belmont Acharacle PH36 4JL
Part Retrospective installation of Access with Parking and Turning
-
24/01995/PNO Granted
Land 330M NW Of Easter Aberchalder House Gorthleck Inverness
Erection of agricultural building
-
24/02104/SCOP Decided
Corran Ferry Corran Jetty Fort William
Corran Ferry Infrastructure Improvement Scheme (EIA Screening reference 23/03630/SCRE).
-
24/02094/S36 Decided
Land 1150M SW Of Tigh An Alt Acheilidh Rogart
Acheilidh Wind Farm - Erection and operation of a wind farm for a period of 35 years, comprising of 12 wind turbines with a maximum blade tip height of between 200m and 230m, battery energy storage system (BESS), access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00004528
-
24/02087/RCC Awaiting decision
Start Location: A938, Dulnain Bridge And End Location: A938/A95 Junction, Upper Gaich, Dulnain Bridge
Dulnain Bridge Shared Use Path (AECOM Site 1)