Skip to content
PlanIndex Get alerts
Menu

Planning application

LA08/2026/0202/PAN

115 Milltown Road, Tullymore Otra, Milltown, Armagh, BT71 7LZ and adjacent lands to the north and east

Decided Armagh City, Banbridge and Craigavon Proposal of Application Notice

Proposal

Proposed Alteration & Extension to Existing Tyre Bailing Building, to facilitate change of use for the storage and thermal treatment of hazardous and non-hazardous wastes through provision of a combined heat and power (CHP) unit for utilisation of both electrical and heat energy at the existing site with export potential, and erection of additional manufacturing building for existing manufacturing business. Development to include the extension of the existing site to facilitate the proposed buildings, yard, HGV and car parks and associated site works including the demolition of existing buildings and alterations to existing access.

As published by the council, reference LA08/2026/0202/PAN

Timeline

Dates from the published record

  1. 23 Feb 2026

    Received by Armagh City, Banbridge and Craigavon

  2. 31 Mar 2026

    Decision issued: Acceptable

  3. 29 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Armagh City, Banbridge and Craigavon is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.