Planning application

LA08/2025/1424/F

Iveagh Primary School 17 Castle Hill, Rathfriland BT34 5NH

Proposal

Demolition of existing primary school building and replacement with a new 10-class primary school building; installation of photovoltaic panels to roof; erection of covered bicycle shelter; erection of bin store enclosure; and provision of site landscaping including new internal road configuration, car parking, bus and car drop off areas, pedestrian crossing points, hard and soft surface play areas, lamp standards and other associated site works. The proposed works also include temporary alterations to the existing school building, involving partial demolition and reinstatement of external elevation, in advance of the complete demolition of the existing building; temporary classroom and office buildings; temporary hoarding; and temporary use of access onto Downpatrick Road to facilitate phased construction of the development

As published by the council, reference LA08/2025/1424/F

Timeline

Dates from the published record

  1. 4 Nov 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 2 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 15 Jun 2026

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA08/2026/0371/F Withdrawn

    10 Caddells Lane, Rathfriland, Newry, BT34 5PX

    Internal and External alterations and change of use from existing retail unit (Use Class A1) and existing garage/store (Use Class B2/B4) to form 2 No. dwelling units (bedsits) (Use Class C1)

    11 Apr 2026 171m away Full applications
  • LA08/2025/1275/F Awaiting decision

    1a Church Square, Rathfriland, BT34 5PT

    Conversion of existing flat into a House of Multiple Occupation (HMO) (5nr bedrooms).

    13 Oct 2025 287m away Full applications

In Armagh City, Banbridge and Craigavon

  • 107 Kilmore House Cornakinnegar Road, Cornakinnegar Road, Craigavon, BT67 9JP

    Demolition of part of the ground floor wall to create a larger kitchen and dining area, including opening up the existing low ceiling to form a vaulted space with provision of ridge glazing. Also included is the reconfiguring existing Bedroom to provide a dedicated dressing area and and shower room.

    22 Apr 2026 Full applications
  • Carrick Primary School, Sloan Avenue, Lurgan, Craigavon BT66 8NY

    Provision of 1no Modular Classroom and associated siteworks

    21 Apr 2026 Full applications
  • 260 Kernan Hill Manor, Portadown, Craigavon BT63 5WU

    Ground Floor Bedroom & Shower Room Rear Extension & Level Access to Front Door

    16 Feb 2026 Full applications
  • 97 Brownstown Road, Portadown, BT62 3PZ

    Retention of domestic garage and increased curtilage

    2 Dec 2025 Full applications
  • 42 Iveagh Drive, Banbridge, BT32 3YE

    Erection of two storey side extension, internal alterations and associated site works

    22 May 2026 Full applications