Planning application
Lands between the existing Kells Main Substation, Maxwell's Road, Ballymena, County Antrim and the proposed Switching Substation at Whitesides Road, Terrygowan, County Antrim (approximately 11km of the existing overhead line within Antrim & Newtownabbey Borough Council area)
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The proposal relates to the SONI Mid-Antrim Upgrade Project, with this application comprising the following elements (Phase 1 of the overall project): - A new proposed switching substation at Whitesides Road (approximately 800m north east of the junction between Whitesides Road and Portglenone Road), Terrygowan, County Antrim (located within Mid & East Antrim Borough Council area) with configuration of the adjacent, existing 110kV overhead line - An uprate (replacement of existing cables) of the existing overhead line between the existing Kells substation, Maxwell's Road, Ballymena, Country Antrim, and the new proposed switching substation at Whitesides Road, Terrygowan (approximately 11km of overhead line within Antrim & Newtownabbey Borough Council area)
As published by the council, reference LA03/2025/0852/PAN
Application record
- Reference
- LA03/2025/0852/PAN
- Type
- Proposal of Application Notice
- Status
- Determined
- Decision
- Granted As published: Acceptable
- Received
- 14 Nov 2025
- Validated
- 14 Nov 2025
- Decided
- 25 Nov 2025
- Ward
- Parkgate
Timeline
Dates from the published record
-
14 Nov 2025
Received by Antrim and Newtownabbey
-
25 Nov 2025
Decision issued: Acceptable
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Antrim and Newtownabbey granted permission on 25 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.