Skip to content
PlanIndex Get alerts
Menu

Landscapers · YO32

8 potential projects within 5 miles of YO32.

From the planning register, over the last 90 days, matched to the work landscapers do. Every one of these is a real application at a real address.

8 Applications near you Within 5 miles of YO32, over the last 90 days
4 Already approved Permission granted. Most have nobody booked yet.
3 Kinds of work Matched to what a landscaper does

What kind of work it is

Over the last 90 days

Kind of applicationNear you
Conditions 3
Householder 3
Trees 2

A few of them

Approvals first, because an approval is a budget looking for a builder

  • Site To The South Of Newlands Farm Land Between Newlands Farm Lane And Corban Lane Shipton

    ZB26/00737/DORYG Submitted 23 Apr 2026 North Yorkshire

    Discharge of requirement 18 (2a) (Shipton Tee Cable Sealing End Compounds fencing - Design Approach to Site Specific Infrastructure (Document reference: OPN2-JMS-CNS-REP-0002) details submitted in relation to Stage 5.2 of The National Grid Yorkshire Green Energy Project Development Consent Order 2024 (the order) relating to the Local Authority Area of North Yorkshire Council

    Granted Conditions 4 docs
  • Site To The South Of Newlands Farm Land Between Newlands Farm Lane And Corban Lane Shipton

    ZB26/00737/DORYG Submitted 23 Apr 2026 Yorkshire Dales National Park

    Discharge of requirement 18 (2a) (Shipton Tee Cable Sealing End Compounds fencing - Design Approach to Site Specific Infrastructure (Document reference: OPN2-JMS-CNS-REP-0002) details submitted in relation to Stage 5.2 of The National Grid Yorkshire Green Energy Project Development Consent Order 2024 (the order) relating to the Local Authority Area of North Yorkshire Council

    Granted Conditions 4 docs
  • Site To The South Of Newlands Farm Land Between Newlands Farm Lane And Corban Lane Shipton

    ZB26/00737/DORYG Submitted 23 Apr 2026 North York Moors National Park

    Discharge of requirement 18 (2a) (Shipton Tee Cable Sealing End Compounds fencing - Design Approach to Site Specific Infrastructure (Document reference: OPN2-JMS-CNS-REP-0002) details submitted in relation to Stage 5.2 of The National Grid Yorkshire Green Energy Project Development Consent Order 2024 (the order) relating to the Local Authority Area of North Yorkshire Council

    Granted Conditions 4 docs
  • 14 Westminster Road York YO30 6LY

    26/00761/TPO Submitted 23 Apr 2026 York

    Fell 1no. Elder, 1no. Laburnum and 1no. Holly; Reduce the branch work of 1no. Silver Birch tree on neighbouring land back to the boundary fence line - protected by Tree Preservation Order no. 2

    Granted Trees 3 docs
    Small domestic
  • Gower House Rudcarr Lane Warthill YO19 5TL

    ZE26/00543/HOUSE Submitted 26 Jun 2026 North York Moors National Park

    93% historically approved · decision due ~1 Sep

    Erection of first floor extension to an existing single storey structure in rear garden

    Awaiting decision Householder Extension 10 docs
    Small domestic
  • Gower House Rudcarr Lane Warthill YO19 5TL

    ZE26/00543/HOUSE Submitted 26 Jun 2026 Yorkshire Dales National Park

    94% historically approved · decision due ~1 Sep

    Erection of first floor extension to an existing single storey structure in rear garden

    Awaiting decision Householder Extension 9 docs
    Small domestic

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode