Skip to content
PlanIndex Get alerts
Menu

Electricians · WA6

212 applications within 5 miles of WA6 in the last 12 months, 9 of them matched to the work electricians do.

From the planning register. Every one of these is a real application at a real address.

212 Applications near you Every kind, within 5 miles of WA6, in the last 12 months
9 Matched to the work electricians do Read from the proposal text itself
3 Already approved Permission granted. Most have nobody booked yet.

Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.

Cheshire West and Chester: 3,327 applications received in the last year, 492 decisions published. Decision alerts here will be sparse until the council publishes more outcomes.

Halton: 295 applications received in the last year, 161 decisions published.

What kind of work it is

Over the last 12 months

Kind of applicationNear you
Full applications 9

A few of them

Approvals first, because an approval is a budget looking for a builder

  • Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

    26/01781/FUL Submitted 11 Jun 2026 Cheshire West and Chester

    Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

    Granted Full applications Extension 15 docs
    Small domestic
  • 5 The Elms Runcorn Cheshire WA7 4JS

    26/00186/FUL Submitted 15 May 2026 Halton

    Proposed replacement of 4 No. existing single glazed timber sash windows with double glazed timber sash windows, addition of 3 No. conservation type roof lights and internal removal of non-historic plasterboard partitions and installation of an internally mounted air source heat pump at

    Granted Full applications Loft or dormer Windows or glazing 11 docs
  • Land At Aston Grange Aston Frodsham

    24/03807/FUL Submitted 20 Dec 2024 Cheshire West and Chester

    Installation and operation of a ground mounted photovoltaic (PV) solar energy generation system (solar farm), energy storage facility and, associated infrastructure and engineering works in association with the laying of connection cable

    Granted Full applications 136 docs

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 47 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode