Skip to content
PlanIndex Get alerts
Menu

Electricians · TS25

5 potential projects within 5 miles of TS25.

From the planning register, over the last 90 days, matched to the work electricians do. Every one of these is a real application at a real address.

5 Applications near you Within 5 miles of TS25, over the last 90 days
3 Already approved Permission granted. Most have nobody booked yet.
1 Kinds of work Matched to what a electrician does

What kind of work it is

Over the last 90 days

Kind of applicationNear you
Full applications 5

A few of them

Approvals first, because an approval is a budget looking for a builder

  • UNIT 2 STRANTON RETAIL PARK BURN ROAD HARTLEPOOL TS25 1QQ

    H/2026/0157 Submitted 20 May 2026 Hartlepool

    Installation of 4no. external air source heat pump units

    Granted Full applications 27 docs
  • 35 RELTON WAY HARTLEPOOL TS26 0BB

    H/2026/0115 Submitted 13 Apr 2026 Hartlepool

    Erection of a two-storey side and rear extension, single storey rear extension, single storey side extension, single storey front porch extension and proposed alterations to raised patio with the retaining wall (installation of solar panels to rear and alteration to existing rear first floor window to serve proposed en-suite).

    Granted Full applications Extension Windows or glazing 46 docs
    Small domestic
  • WEST PARK PRIMARY SCHOOL CONISCLIFFE ROAD HARTLEPOOL TS26 0BU

    H/2026/0060 Submitted 2 Mar 2026 Hartlepool

    Installation of air source heat pump and associated works, including new open mesh fenced compound

    Granted Full applications 28 docs
  • ALDI 1 Moreland Avenue Billingham Stockton-on-Tees TS23 2JT

    26/1504/FUL Submitted 6 Aug 2026 Stockton-on-Tees

    97% historically approved · decision due ~27 Oct

    Application for the installation of 3No. Air Source Heat Pumps, erection of store plant equipment, including all other associated works.

    Awaiting decision Full applications 9 docs
  • Unit 3 Percy Drive Wynyard Billingham Stockton-on-Tees TS22 5XN

    26/1380/FUL Submitted 14 Jul 2026 Stockton-on-Tees

    97% historically approved · decision due ~10 Nov

    Installation of EV charging hub, including associated infrastructure, lighting and CCTV

    Awaiting decision Full applications 20 docs

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 46 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode