Plumbers · RH13
6 potential projects within 5 miles of RH13.
From the planning register, over the last 12 months, matched to the work plumbers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 4 |
| Householder | 2 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Chapel Lodge Forest Road Colgate West Sussex RH12 4TB
Formalisation of existing secondary access with the erection of new gates/piers, drainage improvements, and improvement to and levelling of the rear garden.
Granted Householder 12 docsDomestic -
Bridge House Environmental Centre Five Oaks Road Slinfold West Sussex RH13 0QW
Replacement of existing vehicle access and pathway running through the site from mixed surfaces to tarmacadam surface. Renew drainage system and replace chipping parking area with Bodpave surface and chippings.
Granted Full applications 17 docs -
Old Pinkhurst Bashurst Hill Itchingfield West Sussex RH13 0NY
98% historically approved · decision due ~12 Aug
Erection of a single storey rear extension, re-roofing of 2no. outbuildings, and relocation of an external boiler. (Householder Application).
Awaiting decision Householder Extension 14 docsSmall domestic -
Ingfield Manor School Ingfield Manor Drive Five Oaks Billingshurst West Sussex RH14 9AX
77% historically approved · decision due ~28 Jul
Expansion of the existing school including the construction of 3 linked single-storey buildings, a sports hall, playground, parking, landscaping, drainage, and associated development, following demolition of redundant buildings.
Awaiting decision Full applications Demolition 79 docsSmall domestic -
Land North of Little Slaughterford Chapel Road Barns Green West Sussex
77% historically approved · decision due ~17 Feb
Proposed development of 68 dwellings with vehicular and pedestrian accesses, public open space, hard and soft landscaping and associated works including supporting foul and surface water drainage works, and works to existing culverted watercourse on site.
Awaiting decision Full applications 601 docsMajor scheme -
Mowbray Development Site, Employment Land
77% historically approved · decision due ~1 Dec
Construction of Primary Road from the Left-In, Left-Out junction with the A264 (constructed pursuant to Outline Planning Permission DC/16/1677) to Bush Lane (Bridleway 1585), footpaths and cycleways, foul and surface water drainage including a SUDS basin and foul pumping station, landscaping, substations and associated infrastructure.
Awaiting decision Full applications 186 docs
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.